BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a medical facility in Clay, New York. Completed plans call for the renovation of a 18,000-square-foot, one-story above grade medical facility.

As of June 7, 2024, this project has been completed. No additional information is expected. The previous solicitation is listed below for reference. Project involves the renovation of an existing building (the former Bryant & Stratton School) into a neurological rehab facility and a hematology lab. This project was bid in September of 2022. Due to the extended period of time that has elapsed between then and now, due to lease execution delays by tenant (Upstate), the project is being re-priced. Parsons-McKenna Construction Co., Inc is the Construction Manager for the project. There have been a few "value-engineering" changes that have been made. Most of the changes involve the cabinetry, soffits above the cabinetry, aluminum framed, glass dividers at the reception areas, and the lockers. Please review the drawings and reflect the changes in your revised quotes. Work includes site work, site concrete, gates at existing dumpster enclosure, asphalt patch & striping, brick pavers. concrete sidewalk replacement, select demolition, concrete piers, concrete sign base, concrete slab in-fill, masonry at sign base, cultured stone, structural and miscellaneous steel, rough carpentry, finish carpentry, cabinets, Plam and SS counters, SS sills, roof penetrations & patch, metal wall panels at sign, doors & hardware, HM window frames, aluminum storefront doors & windows, glass & glazing, gypsum systems, ACT, FRP, resilient flooring, porcelain tile, rubber flooring, walk-off mat, painting, wall protection, corner guards, bathroom accessories, lockers, fire extinguishers/cabinets, cubicle curtain tracks & curtains, specimen pass thru-door, Mapes canopy, roller window shades, fire protection, plumbing, HVAC, electrical. Alternate #1: Provide a separate cost for work done in the east and west common corridors. This labeled as "Landlord Work" Plans. STANDARD WAGE RATES APPLY. (NO PREVAILING WAGE REQUIREMENTS) Specifications are listed on the drawings. Except for the door hardware. That spec has been uploaded to the site. INCLUDE NYS Sales Tax on Materials. Removal of plumbing, fire protection, HVAC, and electrical equipment, ductwork, piping, and fixtures is by the MEP trades. There is a site visit scheduled for 8:00 AM on Wednesday, March 22nd. Work is scheduled to start mid-May 2023. Work to be complete by December 2023. All questions regarding the work of this project should be directed to Jake McKenna via e-mail. jmckenna@parsonsmckenna.com

Occupancy

Medical

$2,600,000.00

Public - State/Provincial

Remodeling, Renovation

3

7

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
69
Bidding Soon
965
All Active Projects
525
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

May 15, 2023

img_map_placeholder

8687 Carling Rd, Clay, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.