Published October 3, 2022 at 8:00 PM

Updated February 17, 2024

Demolition, site work, renovation and addition to a military facility in Johnston, Iowa. Completed plans call for the expansion of a military facility.

The general scope of work includes: Base Bid: An approximately 2,856 s.f., 2 story Barrack addition to existing building S-54 including, but not limited to, site utilities, site drainage flumes, selective demolition, poured concrete footings and foundation walls, concrete slab-on-grade, CMU bearing walls and interior partitions, precast hollow core concrete floor system with concrete topping, premanufactured wood roof trusses, wood sheathing, asphalt shingle roofing, burnished block and split face block veneer, steel doors and frames, aluminum windows, gypsum board suspended ceilings, painting, concrete sealer/buffer, miscellaneous specialties, furnace units, ductwork, ERV system, water heaters, drains, showers, water closets, urinals, lavatories, lighting, power and data connections, and fire alarm system. Alternate Bid No.1: North wing addition and associated sitework and utilities. Alternate Bid No.2: Delete painting of exterior metal stairs at south addition. Bids shall be submitted on the Bid Form and shall be accompanied by a Bid Security as set forth in the Instructions to Bidders in the amount of five percent (5%) of the total bid amount. Each bid shall be accompanied by a bid bond executed by corporations authorized to contract as surety in Iowa, cashier's check or a certified check drawn upon a solvent bank chartered under the laws of the United States of America, made payable to Iowa Department of Public Defense; as a guarantee that the accepted bidder shall enter into a contract with the State of Iowa and file an approved surety company Performance and Payment Bond for the faithful performance thereof. Upon failure to comply, said check or bid bond shall become forfeited as liquidated damages. Any construction contractor performing work in Iowa (including out-of-state contractors) must comply with Chapter 91C of Iowa Code The Iowa Department of Public Defense reserves the right to reject any and all bids, and to waive irregularities and to accept a bid that is deemed in the best interest of the State of Iowa and the IANG. This project is exempt from Iowa Sales Tax. Davis Bacon Wages will not apply to this project. Deposit will be refunded to bidders upon return of their complete set of Bidding Documents, including any addenda, properly bound and in good condition to Beeline and Blue within 14 calendar days after opening of bids. Cash deposits will not be accepted. A set of the Bidding Documents is also available for review at the Construction and Facilities Management Office, Bldg. 3535 (B-61), Camp Dodge. For questions regarding the portal, please call (515) 244-1611 or 1-800-347-1610. Award of this contract is dependent on receiving requested Federal and/or State funding. If such funding is not received within the thirty (30) day bid guarantee after the date of receiving bids, all rights and obligations under this agreement are considered null and void. For further information regarding this project please call Michael Brothers at (515) 252-4225 or Jocelyn Brincks at (515) 252-4522.

Award

Military

$2,659,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

98

24

10

3

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Design Data, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Underlayment, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Exterior Specialties, Protective Covers
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Furnaces, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
27
Bidding Soon
478
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2022

October 2, 2023

img_map_placeholder

7105 NW 70th Ave, Johnston, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.