BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a military facility in Albuquerque, New Mexico. Completed plans call for the construction of a military facility.

Located at Kirtland AFB in Albuquerque, NM, this project will construct a new Combat Rescue Helicopter (CRH) Simulator Facility at the current Building 954 and 960 locations near the intersection of Eileen Avenue and Biggs Avenue, adjacent to the recently completed CRH Simulator Facility. Project Base Bid and Options (if awarded) will be a 26,232sf facility that houses one large 60'x120' bay for two Combat Rescue Helicopter simulators, one 40'x90' bay for an Aircrew Training Device, 2.5 ton crane for equipment movement, two Image Generator rooms that support the two simulators, six multi-purpose classrooms, three Mission Planning rooms, Administration space, and break room. The Building will be connected to the existing building which will be used as the main entry with a central corridor that travels from the south entry, connecting both phases. In addition to the construction, the project will also consist of a 4,682sf interior renovation of a portion of Building 923, construction of a 95-space parking lot east of Building 957 and related incidental work. Sustainable principles, to include Life Cycle cost effective practices, will be integrated in accordance to UFC 1-200-02. The project will comply with DoD antiterrorism/Force Protection requirements per UFC 4-010-01. But not limited to, please review the specifications for a complete scope of work. Magnitude of Construction: $10M - $25M Prevailing Wages apply. Contract Duration = 670 days *RFI report answering several questions is attached for your review and consideration.

Post-Bid

Military

$25,000,000.00

Public - Federal

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
18
Bidding Soon
325
All Active Projects
134
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 28, 2022

November 28, 2022

img_map_placeholder

To Be Determined, Albuquerque, NM


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.