BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, outdoor lighting and new construction of a mixed-use development in Cooksburg, Pennsylvania. Completed plans call for the construction of a office development; for site work for a office development; for outdoor lighting for a playground / park / athletic field; and playground / park / athletic field.

PROJECT NO.: FDC-202-1 02599 Location: COOK FOREST STATE PARK, CLARION COUNTY, BARNETT Work included under this contract consists of electrical construction work within Cook Forest State Park. The work includes but is not limited to selective demolition, improved electrical power services, trenching and backfilling for new electrical service, exterior lighting fixtures, service entrance panelboard, service to pre-cast concrete building and EV charging station and new service entrance. Engineer's Estimate: $50,000 - $100,000 DGS Small Business Certification Required *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Bond: 10% Performance Bond: 100% Payment Bond: 100% Maintenance Bond: 50% Prevailing Wage Rate: Yes It is further proposed to execute the Contract, including the bonds, in accordance with the requirements of the General Conditions, to begin work within ten (10) days after receipt of Notice to Proceed, and to complete the work within Two Hundred Seventy (270) calendar days after the official starting date. The tenth (10th) day after receipt of Notice to Proceed shall be the official starting date unless the ten (10) day period is extended in writing by the Secretary. It is understood that if the work is not completed within the time above specified or such extension thereof, as shall be granted in accordance with the General Conditions, the Contractor shall pay the Commonwealth of Pennsylvania as liquidated damages and not as a penalty for non-completion of work, the amount of Five Hundred Dollars ($500) per day for each and every calendar day thereafter until the work shall be completed and accepted. Small Diverse Business and Veteran Business Enterprise participation are not required for this contract. Bid result Base Bid 1 - Mashan Inc - $168,000 Base Bid 2 - Mashan Inc - $166,500

Bid Results

Playgrounds / Parks / Athletic Fields

$334,500.00

Public - State/Provincial

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
31
Bidding Soon
641
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 28, 2022

img_map_placeholder

100 PA-36, Cooksburg, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.