Demolition, site work, asbestos abatement and renovation of a mixed-use development in Buffalo, New York. Completed plans call for the renovation of a 12,600-square-foot, three-story above grade medical facility; for the demolition of a medical facility; for asbestos abatement for a medical facility; and for site work for a medical facility.

Award Details Contract Award Date: Feb 23, 2023 Contract Award Number: 36C24223C0056 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: N78KKEV1N7V7 Contractor Awarded Name: WELCH CONSTRUCTION INC Contractor Awarded Address: MARCELLUS, NY 13108 Base and All Options Value (Total Contract Value): $13,477,000.00 General Description: 9C RENOVATION Project number: 528-18-109 The Contractor shall provide all Management, Supervision, Labor, Materials, Equipment, Tools, and Transportation to execute work for the Nuclear Medicine site prep project located at the Buffalo VA Medical Center. This project is being solicited as a 100% TOTAL SDVOSB SET-ASIDE. The magnitude of construction per VAAR Part 836.204 is between $5,000,000 and $10,000,000. NAICS code 236220 and small business size standard is $39.5 Mil. Offeror's must be verified in Vetbiz at the time of bid and contract award. Failure to be both Verified by CVE and VetBiz prior to contract award will result in offerors proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit documents to obtain CVE verification of their SDVOSB status if they have not already done so. In accordance with FAR 52.204-7, prospective contractors shall be registered in the SAM database prior to award of a contract. All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information will be obtained from the bidder's/offeror's insurance company and be furnished on the insurance carrier's letterhead. See full solicitation text for information related to pre-bid site visit, requests for information, bidding materials and public bid opening. See attached specifications and drawings for the required renovations. A site visit is scheduled for 9 am on Thursday, October 13, 2022. All prospective offerors are to meet in the lobby located at the main building and must be wearing a disposable surgical mask prior to entering as cloth masks are no longer allowed in the building. All offerors will be screened for COVID prior to entering the building. Nicholas Winne is the Contracting Officer, and all proposals must be submitted via email to the address specified in P12 - Information regarding bidding material. RFI's must be submitted by 4:00 PM, 26 October 2022 In accordance with FAR 36.209 and VAAR 836.209, an A/E firm cannot be awarded any construction contract for which it designed the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Medical

$13,477,000.00

Public - Federal

Asbestos Abatement, Demolition, Renovation, Site Work

144

29

23

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Spare Parts, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Surveys, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Gypsum Sheathing, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Sheet Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Wood Shingles, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Folding Doors and Grilles, Entrances and Storefronts, Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Glazing Accessories, Louvers and Vents, Louvers, Operable Wall Louvers, Door Louvers, Vents, Wall Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Resilient Tile Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Printers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Pneumatic and Electric Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Air-to-Air Energy Recovery Equipment, Packaged Outdoor HVAC Equipment, Packaged, Outdoor, Central-Station Air-Handling Units, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Overcurrent Protective Device Coordination Study, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Substations, Secondary Unit Substations, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Motor-Control Centers, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Transient Voltage Suppression, Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Structured Cabling, Communications Horizontal Cabling, Data Communications, Data Communications Peripheral Data Equipment, Printers, Voice Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Healthcare Communications and Monitoring Systems, Nurse Call/Code Blue Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Earthwork Methods, Slope Protection, Containment Barriers, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Site Grounding, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Machining Equipment, Routing Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
148
Bidding Soon
2,921
All Active Projects
1,138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

January 16, 2023

img_map_placeholder

3495 Bailey Ave, Buffalo, NY

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Buffalo VA Ward 9C

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.