Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 25, 2024 at 8:00 PM
Updated October 1, 2024
Site work and renovation of a civil project in Mesa, Arizona. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
As of July 25, 2024, a re-zoning plan for this project has been approved. A general contractor has been selected. A firm construction timeline has not been established. The owner has selected a Construction Manager. A timeline for construction has not yet been established. The City of Mesa is seeking a qualified Construction Manager at Risk (CMAR) to provide Pre-Construction Services and complete Construction Services as the CMAR for the Central Mesa Reuse Pipeline - Plant Improvements project. The City of Mesa is proposing various improvements related to plant work associated with the Central Mesa Reuse Pipeline. This work includes the construction of upgrades, replacements, or new equipment associated with delivery of reclaimed water from the Northwest Water Reclamation Plant (NWWRP), the Southeast Water Reclamation Plant (SEWRP), and the Greenfield Water Reclamation Plant (GWRP) to the Gila River Indian Community (GRIC). These improvements may include: Pump station improvements at the NWWRP Construction of a new Intermediate Pump Station (IPS) including a storage reservoir and booster pump facility near the intersection of Val Vista Drive and Thomas Road Pump station improvements at the SEWRP Piping improvements for the SEWRP East Maricopa Floodway discharge (EMF) south of E. Baseline Rd. Piping and pump station improvements at the GWRP Piping improvements at the reuse water discharge location near Val Vista Drive and Hunt Highway Other associated improvements as required. The estimated construction cost is between $18 and $20 million including utility improvements, utility relocations and other ancillary costs. The City anticipates this project to consist of multiple GMP's with the first construction to commence in the winter of 2023. The City has entered into a professional services contract with Black and Veatch Corporation to design these improvements. The CMAR shall work closely with and be an integral part of this project team during the design and construction phases of the project. It is anticipated that the Construction Manager at Risk shall participate in Pre-Construction Services and Construction Services for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Pre-Construction/Negotiated
Water / Sewer
$20,000,000.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2022
July 26, 2024
Multiple Locations, Mesa, AZ
Related To This Project
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
Bid Date: Apr 04 2022
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
Bid Date: Jan 10 2022
Mesa, AZ
Bid Date: Sep 15 2022
Mesa, AZ
Bid Date: Sep 14 2022
Mesa, AZ
Bid Date: Jan 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.