BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2024 at 8:00 PM

Updated July 26, 2024

Site work and renovation of a civil project in Mesa, Arizona. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of July 25, 2024, a re-zoning plan for this project has been approved. A general contractor has been selected. A firm construction timeline has not been established. The owner has selected a Construction Manager. A timeline for construction has not yet been established. The City of Mesa is seeking a qualified Construction Manager at Risk (CMAR) to provide Pre-Construction Services and complete Construction Services as the CMAR for the Central Mesa Reuse Pipeline - Plant Improvements project. The City of Mesa is proposing various improvements related to plant work associated with the Central Mesa Reuse Pipeline. This work includes the construction of upgrades, replacements, or new equipment associated with delivery of reclaimed water from the Northwest Water Reclamation Plant (NWWRP), the Southeast Water Reclamation Plant (SEWRP), and the Greenfield Water Reclamation Plant (GWRP) to the Gila River Indian Community (GRIC). These improvements may include: Pump station improvements at the NWWRP Construction of a new Intermediate Pump Station (IPS) including a storage reservoir and booster pump facility near the intersection of Val Vista Drive and Thomas Road Pump station improvements at the SEWRP Piping improvements for the SEWRP East Maricopa Floodway discharge (EMF) south of E. Baseline Rd. Piping and pump station improvements at the GWRP Piping improvements at the reuse water discharge location near Val Vista Drive and Hunt Highway Other associated improvements as required. The estimated construction cost is between $18 and $20 million including utility improvements, utility relocations and other ancillary costs. The City anticipates this project to consist of multiple GMP's with the first construction to commence in the winter of 2023. The City has entered into a professional services contract with Black and Veatch Corporation to design these improvements. The CMAR shall work closely with and be an integral part of this project team during the design and construction phases of the project. It is anticipated that the Construction Manager at Risk shall participate in Pre-Construction Services and Construction Services for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Pre-Construction/Negotiated

Water / Sewer

$20,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
46
Bidding Soon
1,217
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.