Site work for a water / sewer project in Clayton, Oklahoma. Completed plans call for site work for a water / sewer project.

Construction of a New Pond Pushmataha WMA - Clayton, OK Cost Estimate: $100,000.00 Project Location: Pushmataha WMA - Clayton, OK Contact Person(s) for Questions: ODWC: Richard Beagles - 580-320-3177 richard.beagles@odwc.ok.gov Rebekah Pennington - rebekah.pennington@omes.ok.gov If the bid exceeds $50,000, a cashier's check, a certified check or surety bid bond in the amount of five percent (5%) of the total bid is required. The certified or cashier's check must be delivered to the Owner's (Construction and Properties) Offices prior to the Bid Opening; other bid securities may be uploaded during the completion of online electronic bidding. Security checks will be returned to all but the three lowest bidders after the bid opening. The three lowest bid securities will be retained until the contract is awarded. * Or * A cashier's check, a certified check or surety bid bond in the amount of $0.00 shall be delivered to the Owner's (Construction and Properties) Offices prior to the Bid Opening. Security checks will be returned to all but the three lowest bidders after the bid opening. The three lowest bid securities will be retained until the contract is awarded. These construction specifications cover the materials and installation of embankment ponds and excavated ponds as shown on the plans or as staked In the field. Embankment ponds and excavated ponds shall be constructed to the dimensions, elevations, and grades as specified on the plans, drawings, or job sheets. Construction operations shall be carried out in such a manner that erosion and air and water pollution are minimized and held within legal limits. State and local laws concerning pollution abatement must be followed. Measures and construction methods that enhance fish and wildlife values shall be incorporated as needed and practical. Fencing and cover to control erosion and pollution shall be established as needed. The completed job shall present a workmanlike finish and shall conform to the lines, grades, and elevations shown In the drawings and as staked In the field. All operations shall be carried out in a safe and skillful manner. Safety and health regulations shall be observed and appropriate safety measures used

Award

Water / Sewer

$127,500.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
52
Bidding Soon
505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2022

October 27, 2022

Project location map

Multiple Locations, Clayton, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.