BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Seneca Falls, New York. Completed plans call for the renovation of a municipal facility.

IMPORTANT NOTE: Each bidder shall submit with its bid a separate sealed list that names each subcontractor that the bidder will use to perform work on the contract, and the agreed-upon amount to be paid to each, for: (a) site work (b) general construction (c) electric wiring and standard illuminating fixtures. After the low bid is announced, the sealed list of subcontractors submitted with such low bid shall be opened and the names of such subcontractors shall be announced, and thereafter any change of subcontractor or agreed-upon amount to be paid to each shall require the approval of the public owner, upon a showing presented to the public owner of legitimate construction need for such change, which shall be open to public inspection. Legitimate construction need shall include, but not be limited to, a change in projectspecifications, a change in construction material costs, a change to subcontractor status as determined pursuant to paragraph (e) of subdivision two of section two hundred twenty-two of the labor law, or the subcontractor has become otherwise unwilling, unable or unavailable to perform the subcontract. The sealed lists of subcontractors submitted by all other bidders shall be returned to them unopened after the contract award. Section two hundred twenty-two of the labor law providesin relevant part: The Owner of the Project "shall consider the financial and organizational capacity of contractors and subcontractors in relation to the magnitude of work they may perform, the record of performance of contractors and subcontractors on previous work, the record of contractors and subcontractors in complying with existing labor standards and maintaining harmonious labor relations, and the commitment of contractors to work with minority and women-owned business enterprises pursuant to article 15-A of the executive law through joint ventures of subcontractor relationships." The project consists of demolition of existing stairs and exterior deck, preparing existing foundations for new construction, providing a new concrete "sonotube" footings, new stairs and deck made of pressure treated wood. This work will also include new metal pipe handrails, metal handrails, and synthetic wood guard rails as depicted in the drawings. Also included is repairs / replacement of the existing roof eave, fascia, soffit and other associated trim boards. All exterior wood elements will be painted. Contractor to start work immediately after given the notice to proceed. Scope of work to be completed within sixty (60) days after start of the work. No Bidders may withdraw Bids within sixty (60) days after the date set for the opening thereof. Any questions regarding the bidding of this project shall be directed to John Snyder, of John Snyder Architects, PLLC. in Ithaca, NY, at (607) 273-3565. Attention of Bidders is particularly called to requirements as to conditions of employment to be observed and prevailing wage rates to be paid under the Contract. Seneca County reserves the right to waive any informalities in or to reject any or all Bids.

Award

Municipal

$162,000.00

Public - County

Renovation

5

11

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
67
Bidding Soon
989
All Active Projects
533
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

October 20, 2022

img_map_placeholder

27 Cayuga St, Seneca Falls, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.