BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marion, Indiana. Completed plans call for site work for a water / sewer project.

Scope- plug 8 wells. 1. Alternate 1 Bid includes plugging 5 additional wells. 2. Alternate 2 Bid includes plugging 5 additional wells A. Clear Site of all refuse & trash B. Drain & backfill all excavations; level surface to its original contours. C. Remove equipment, materials and above ground flow lines. All cut off flowlines must be capped. D. Remove all buildings, power lines & poles, concrete pads, contaminated soil and waste. E. Restore the surface as nearly as practicable to its condition before drilling. Minority Contractors are encouraged to submit bids on this project as a prime contractor or through a prime contractor. Bids shall be taken from Prime Contractors pre-qualified by the Public Works Certification Board in the following classification(s): 1799.06 Oil Well Services The Specified construction period is 710 calendar days. The State of Indiana reserves the right to reject any and all bids. Projected Goal of 7% MBE, 5% WBE and 3% IVOSB. Description of project for bid: This project includes the plugging, and abandonment of oil, gas, or class II injection wells and all associated tank sites located in Grant, Miami, Wabash, Howard and Tipton Counties, IN. This includes removal of all equipment associated with the wells and site leveling and restoration to predrilling conditions. This project does not require any long-term soil or ground water remedial actions be taken. The work consists of plugging the wells according to the approved "Well Plugging Plans" that are required to be prepared by the contractor based on the construction of the well from what our records show using plugging rules under 312 IAC 29-33 and including requirements for plugging and abandoning wells for oil and gas purposes under IC 14-37. The Contractor shall furnish all labor, supervision, materials and equipment necessary to complete the project to include landowner notification, plugging plan creation, plugging, site restoration, and filling out well plugging reports to include all documentation required with reports. All required forms and reports are in exhibit A.

Bid Results

Water / Sewer

$476,980.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
90
Bidding Soon
879
All Active Projects
436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

December 16, 2022

img_map_placeholder

Multiple Locations, Marion, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.