BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a bridge / tunnel in Berry Creek, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

127EAW22R0070 - Milsap Bar Bridge Retaining Wall - Amendment A00001 The purpose of this solicitation amendment is to post RFI round 1 responses and revised schedule. Attached is "RFI Official Responses - 1" and "3. Schedule - Revised 31 Aug 2022" which are hereby incorporated into any subsequent contract award. Failure to use the revised schedule will result in your proposal being non-responsive. /////////////////////////////////////////////////////////////////////////////////////////////////////////////// 127EAW22R0070 - Milsap Bar Bridge Retaining Wall Plumas National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $100,000 and $250,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 31st, 2022. An organized pre-proposal site visit will be held. See Provision 452.237-71 on page 37 for complete details. In no event shall failure to inspect the site constitute grounds for a claim after contract award. *** This project will not begin until MAY 2023*** PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$250,000.00

Public - Federal

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
22
Bidding Soon
485
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

June 1, 2023

img_map_placeholder

Milsap Bar Rd, Berry Creek, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.