Published May 17, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a power facility in Oakland, California. Completed plans call for the renovation of a power facility.

**As of May 17,2023, this project has not yet been awarded. A timeline for award has not yet been established.* Project has been postponed, will be re-advertised at a later date. Bids will thereafter be accepted or rejected by the District. The Bidders are responsible to ensure their Bids are received at the time and location specified. The time for receipt of Bids may be extended by the District's General Manager, or authorized representative, from the above-stated Bid Opening date. Notice of such extension will be published at least once in a newspaper of general circulation in the District, which publication will be at least ten (10) Days before Bids are formally received and opened. Bidders should note that this Contract is subject to the District's Small Business Program that includes a preference of 7 % of the Bid Price of the lowest responsible Bidder, up to a maximum of $150,000, for a certified Local Small Business (LSB) Prime Contractor submitting a Bid on this Contract. Bidder's attention is directed to the Instructions to Bidders Paragraphs 7.I and 14.B.1 and Supplementary Conditions Article SC7.4, which set forth the Districts Small Business Program requirements. Inquiries regarding the Districts Small Business Program shall be directed to the District's Office of Civil Rights, 2150 Webster Street, 4th Floor, Oakland, CA 94612, Telephone at (510) 464-6100 Bidders should note that this Contract is subject to the District's Small Business (SB) Participation Program that includes a preference for Bidders who meet or exceed the Local Small Business (LSB) Subcontractor participation goal of 11% of the total Bid Price excluding Allowances and Option Bid items, established for this Contract. Bidders that meet or exceed the LSB Subcontractor participation goal will be eligible for a Bid preference of 7 % of the Bid Price of the lowest responsible Bidders total Bid price up to a maximum of $150,000, only during evaluation for determining Award of the Contract. However, the actual Contract awarded will be for the amount of the original Bid. Bidders that do not meet the LSB Subcontractor participation goal will not be eligible for the preference. Bidder's attention is directed to the Instructions to Bidders, Paragraphs 7.B.6 and 14.B.1 and Supplementary Conditions Article SC7.4 that more fully describe the terms of the Small Business Program. Inquiries regarding the Districts Small Business Program shall be directed to the District Office of Civil Rights, 2150 Webster Street, 4th Floor, Oakland, CA 94612, Telephone at (510) 464-6100 Prospective Bidders or Interested Parties may also purchase printed copies of the Contract Documents from the District Secretarys Office by downloading the Contract Documents' Order Form from the BART Procurement Portal website and submitting the completed Contract Documents' Order Form to the District Secretarys Office. Prospective Bidders or Interested Parties must be registered on the BART Procurement Portal to do business with BART in order to be able to download the Contract Documents Order Form. The Base Bid includes providing all labor, equipment, materials, tools, supervision, hardware, and all appurtenances necessary for the demolition, procurement, and installation of one (1) traction power facility located in Walnut Creek: 1. Furnish and install new Reversible Controlled Rectifiers (RCR) for the new Traction Power Substation at Walnut Creek (CWC). 2. The Work of this Contract also includes furnishing and installation of a new Emergency Transfer-Trip System (ETTS) including: 3. Furnish and install new ETTS equipment including raceways, circuit modifications and all incidentals to existing dc switchgear controls at the three (3) existing traction power facilities: CZB, CCC, and CXW. 4. Furnish and install new ETTS equipment including raceways, circuit modifications, and all incidentals to existing emergency trip circuits at one (1) existing train control room: C40. 5. The Contract includes two Options as described below. The options, if exercised, shall be determined by the District within 45 days after Notice to Proceed (NTP): 6. Option A is to furnish and install the Walnut Creek Switching Station. 7. Option B is to furnish and install uncontrolled rectifiers in lieu of reversible controlled rectifiers at Substation CWC in Walnut Creek. Refer to Contract Sheets TP080B and TP142B, and to Contract Specification Section 34 21 21, Transformer-Rectifier Units Oil-Filled Transformer, Uncontrolled Rectifier for information. Furnish and install the major traction power equipment as indicated in the contract including providing testing, system integration and commissioning support of the CWC traction power facility. The CWC traction power facility shall be complete and fully integrated into the existing BART system, prior to handover to BART. If there are any questions regarding the Bid Matchmaking Session(s), please contact: San Francisco Bay Area Rapid Transit District Office of Civil Rights 2150 Webster Street, 4th Floor Oakland, California 94612 Attention: Fred Edwards, Sr Admin. Analyst, OCR Email: fedwar1@bart.gov The Availability Percentages for this Contract are, for Minority Business Enterprises (MBEs) 6.0% and for Women Business Enterprises (WBEs) 3.9%. If a firm is owned and controlled by a Minority Woman or Minority Women, the firm may be counted towards meeting both the MBE and WBE Availability Percentages. Bids shall be submitted in accordance with, and subject to, the conditions contained in the Instructions to Bidders contained in the Contract Book to which prospective Bidders are referred. Bid Documents may be examined at certain public and private plan rooms. Each Bid shall be accompanied by a Bidder's Security equal to at least ten percent (10%) of the total Bid Price which shall remain in full force and effect for the period of time stated in the Instructions to Bidders, Paragraph 14.C. The Bidders Security must be in the form of cash, a cashiers check, a certified check, a Bidders Bond, or a combination thereof. The Bidder to whom the Contract is awarded shall comply with the District's insurance requirements Such Bidder shall also furnish a Performance Bond and a Labor and Materials Bond (Payment Bond), each in an amount not less than one-hundred percent (100%) of the Contract Price. Bonds shall be on forms provided by the District and shall be executed as surety by a corporation or corporations authorized to issue surety bonds in the State of California, as an admitted surety insurer and acceptable to the District. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Power Plant

$279,685.00

Public - City

Renovation

243

38

77

5

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Supplier Qualifications, Temporary Facilities and Controls, Construction Facilities, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Waste Receptacles, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Battery Racks, Battery Chargers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Trenching and Backfilling, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Containment Barriers, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Traction Power, Traction Power Distribution, Traction Power Substations, Traction Power Switchgear, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
132
Bidding Soon
2,117
All Active Projects
922
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2023

July 3, 2023

img_map_placeholder

To Be Determined, Oakland, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Traction Power Facilities Replacement - Walnut Creek

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.