BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2022 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Catlin, Illinois. Completed plans call for the renovation of a educational facility.

The project consists of: Mechanical replacements and window replacements at Salt Fork High School and Gym Buildings. An electrical upgrade is also required for the buildings as shown on the drawings. NOTE: Do not purchase the download-only option if you are choosing the refundable deposit set. Digital purchases are a non-refundable, out-of-pocket expense.

Award

Educational

$4,014,420.00

Public - County

Renovation

64

23

72

8

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
81
Bidding Soon
963
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

November 3, 2022

Project location map

701 W Vermilion St, Catlin, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.