BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Fremont, Nebraska. Completed plans call for site work for a pipeline.

**As of October 10, 2022, project was awarded to Primoris Services Corporation, awarded amount is $487,873.20.** Each bid shall be accompanied by a certified check, cashier's check, or a bank draft on a solvent Nebraska bank insured by FDIC or a bid bond in the amount not less than five percent (5%) of the bid price. That bid security shall be sealed and addressed to the City Clerk, Fremont, Nebraska and labeled on the outside "SOUTH FREMONT GAS MAIN EXPANSION PROJECT". Any bids received from contractors not so qualified will be returned unopened. The bid security shall guarantee the bidder's good faith to enter into the contract within ten (10) days at the bid price if accepted by the City Council. Any proposal received which is not accompanied by a bid security will not be considered. The bid security of the successful bidder will be returned when the contracts have been signed, filed with, and approved by the City. The bid security of the unsuccessful bidders will be returned when their bids are rejected. The City of Fremont hereby reserves the right to accept that bid which, in its judgement, will produce the best job of workmanship and material, whether or not it is the lowest bid; and reserves the right to reject any or all bids and to waive any or all informalities of any proposal. The successful bidder will be required to submit an acceptable Affirmative Action Statement and Program to the Office of the Mayor within ten (10) days after the bid has been awarded by the Fremont City Council. Failure to submit an acceptable Affirmative Action Statement and Program within the time allotted shall result in the forfeiture of the bidder's bond. The contractor shall be required to furnish a Performance, Payment, and Maintenance Bond in a sum equal to one-hundred percent (100%) of the contract price, for a period of one (1) year past the completion of the project. Before the Final Payment may be made on the final three percent (3%) of the contract, the contractor shall furnish a written clearance from the Commissioner of Labor of the State of Nebraska, certifying that all payments then due of contributions or interest which may have arisen under the contract have been made by the contractor or his subcontractors to the Unemployment Compensation Fund. The contractor shall complete the work not later than March 4, 2023. Liquidated Damages of Five-Hundred Dollars ($500.00) per working day will be assessed after the time for completion has expired. The proposed work consists of furnishing all labor, new materials, tools, equipment, and services necessary for the construction of the SOUTH FREMONT GAS MAIN EXPANSION PROJECT located in Fremont, Nebraska, including all other incidental work as shown on the Drawings and as herein specified. The City of Fremont is planning to install a new distribution pipeline from a new district regulator station located at Downing and Cloverly that transports gas to the Wholestone Farms meter set. The new pipeline will also tie back into the existing distribution station in two (2) places; one on Yager Rd and the other on Platte Ave. The project includes approximately 5,500 feet of 6-inch HDPE pipe, approximately 1,000 feet of 4-inch HDPE pipe, a new district regulator station, and two (2) tie-ins with the existing distribution system. The new pipeline will be installed primarily on public right-of-way. The exact course of the pipelines is indicated on the associated drawings

Award

Pipeline

$487,873.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
46
Bidding Soon
521
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

November 21, 2022

img_map_placeholder

Multiple Locations, Fremont, NE


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.