EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 23, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Nipomo, California. Completed plans call for site work for a water / sewer project.

240 successive calendar days after the commencement date stated in the Notice to Proceed. DESCRIPTION OF WORK: The WORK includes but is not limited to furnishing all labor, materials, equipment, services, and performing all work necessary and incidental to the construction of a new sewage force main system which includes: approximately 18,000 linear feet of new 6-inch diameter butt-fused HDPE sewer force main pipeline in open trench; approximately 1,600 linear feet of new 6-inch diameter butt-fused HDPE sewer force main installed via horizontal directional drilling methods; approximately 1,600 linear feet of new 12-inch diameter gravity sewer main via open trench or using trenchless technology; new manholes; approximately 24,500 linear feet of new fiber optic conduit and handholes and vaults; new electrical conduits for future odor control equipment; new force main pump-outs and air release vault assemblies; pavement removals and replacements; and, and stockpiling of trench excavation material . Contractor to provide all necessary work plans, permits, and inspections necessary for complete turnkey installation. SITE OF WORK: The project site is located in public right of way beginning at the intersection of Willow Road and Sundale, then along Sundale to Camino Caballo, then along Camino Caballo to Pomeroy, then along Pomeroy to Juniper, then along Jupiter to Mary Avenue, in Nipomo, California 93444. BID SECURITY: Each Bid shall be accompanied by a certified or cashier's check or Bid Bond in the amount of 10 percent of the Total Bid Price payable to the Nipomo Community Services District as a guarantee that the Bidder, if its Bid is accepted, will promptly execute the Agreement and provide all required bonds and insurance. A bid shall not be considered unless one of the forms of Bidder's security is enclosed with it. CONTRACTOR S LICENSE CLASSIFICATION: In accordance with the provisions of California Public Contract Code Section 3300, the OWNER has determined that the CONTRACTOR shall possess a valid Class A General Engineering contractor s license issued by the State of California, Contractors State License Board, at the time that bids are submitted. Failure to possess the specified license shall render the Bid non-responsive and shall bar award of the Contract to any bidder not possessing the license at the time bids are submitted. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 90 calendar days from the date of bid opening. BASIS OF AWARD: The OWNER will award the contract, if at all, to the responsible contractor that submits the lowest bid. CALIFORNIA WAGE RATE REQUIREMENTS: In accordance with the provisions of California Labor Code Sections 1770, 1773, 1773.1, 1773.6 and 1773.7 as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the WORK is to be performed. A copy of the wage rate determination is on file at the office of the OWNER. It shall be mandatory upon the CONTRACTOR to whom the WORK is awarded and upon any subcontractor under the CONTRACTOR to pay not less than the specified rates to all workmen employed by them in the execution of the WORK. BONDS: The successful bidder will be required to furnish DISTRICT with Payment and Performance Bonds equal to 100% of the Contract Price. Bonds shall be on the forms included in the Contract Documents; DISTRICT will not accept bonds on any other form. RETAINAGE FROM PAYMENTS: The CONTRACTOR may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by the OWNER, by depositing securities of equivalent value with the OWNER in accordance with the provisions of Section 22300 of the Public Contract Code. Such securities, if deposited by the CONTRACTOR, shall be valued by the OWNER, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the CONTRACTOR and the OWNER. OWNER'S RIGHTS RESERVED: The OWNER reserves the right to reject any or all bids, to waive any informality in a bid, and to make award, if any, to the lowest responsive, responsible bidder as it may best serve the interest of the OWNER.

Award

Water / Sewer

$4,705,802.00

Public - City

Site Work

52

20

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Storage Specialties, Storage Assemblies, Storage Racks
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Storage, Storage Equipment and Systems, Storage Racks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
31
Bidding Soon
332
All Active Projects
169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2022

February 17, 2023

img_map_placeholder

Multiple Locations, Nipomo, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Blacklake Sewer System Consolidation Project Force Main

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.