Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Hood River, Oregon. Completed plans call for site work for a bridge / tunnel.
Replace the wire ropes of the lift span of the Hood River- White Salmon Interstate Bridge ("Bridge"). The Bridge includes a through truss vertical lift span. The lift span and associated counterweights are supported by a total of 16 wire ropes (counterweight ropes) with four wire ropes at each corner of the lift span. The wire ropes extend from the lift span terminations, above the roadway, up and over sheaves located at the top of the two lift span towers and terminate at the counterweights. This project includes the removal, procurement of new components, and replacement of all 16 wire ropes and associated rope clamps, keeper plates, shims, and pins with all work being done during closures to both highway and marine traffic. The work involves closing the roadway (by the Port of Hood River), jacking the counterweights to allow for wire rope removal, removal and proper disposal of the existing wire ropes, replacing the wire ropes with new wire ropes and associated terminations, and tensioning the wire ropes. All work is to be conducted per the requirements of the contract documents. Plan Holders must subscribe to the project to be notified of any bid addenda by email using the form located on the project web page. Contractors that do not have an authorized presentative attending this walk-through will be considered non-responsive. Bidders are not required to be pre-qualified under ORS 279C.430.
Award
Bridges / Tunnels
$1,119,250.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2022
November 3, 2022
Hood River-White Salmon Interstate Bridge, Hood River, OR
Related To This Project
Hood River, OR
Bid Date: Nov 17 2022
Hood River, OR
Bid Date: Nov 16 2022
Hood River, OR
Bid Date: Dec 07 2023
Hood River, OR
Bid Date: Jan 17 2023
Hood River, OR
--
Hood River, OR
Bid Date: Apr 29 2022
Hood River, OR
Bid Date: Jan 22 2024
Hood River, OR
Bid Date: Jun 09 2022
Hood River, OR
Bid Date: Oct 25 2022
Hood River, OR
Bid Date: Nov 17 2022
Warrenton, OR
Bid Date: Oct 04 2022
John Day, OR
Bid Date: Oct 05 2022
Millersburg, OR
Bid Date: Oct 06 2022
Cascade Locks, OR
Bid Date: Sep 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.