Site work and new construction of an educational facility in San Mateo, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Governing board ("Board") of the San Mateo-Foster City School District (District or Owner) will receive sealed bids for the following project, Bid No. 22-205 (Project): SUNNYBRAE ELEMENTARY SCHOOL NEW MPR BUILDING PROJECT #22-205 2. To bid on this Project, the Bidder is required to be prequalified by the District. The prequalification process is through Quality Bidders on through their website. The Project generally consists of: Construction of a New MPR Building All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. 6. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses: A General Engineering Contractor B General Building Contractor The Bidder's license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract. 7. As security for its Bid, each bidder shall provide with its Bid form a bid bond issued by an admitted surety insurer on the form provided by the District, cash, or a cashiers check or a certified check, drawn to the order of the San Mateo-Foster City School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. 8. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. 9. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. 10. The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available on the Internet at: . Bidders and Bidders' subcontractors shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code. The District's Board has found and determined that the following item(s) shall be used on this Project based on the purpose(s) indicated. (Public Contract Code section 3400(c).) A particular material, product, thing, or service is designated by specific brand or trade name for the following purpose(s): Add Single Source Items: Door Hardware (Schlage) Plumbing (American Standard) Energy Management System (Delta) Fire Alarm (Notifier) 14. The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. 15. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on: Base Bid amount only 16. Bid Period questions about this project are to be submitted in writing to the architect: disidro@csdadesigngroup.com; mfernandez@csdadesigngroup.com; elin@csdadesigngroup.com; and cc:rprice@smfcsd.net

Bid Results

Educational

$12,895,000.00

Public - City

New Construction, Site Work

182

36

48

7

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Concrete Curing, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Finish Carpentry, Architectural Woodwork, Wood Paneling, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Fabricated Wall Panel Assemblies, Siding, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Acoustical Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Folding Doors and Grilles, Entrances and Storefronts, Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Wheelchair Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Emergency Plumbing Fixtures, Emergency Showers
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Irrigation, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
123
Bidding Soon
1,975
All Active Projects
858
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

November 2, 2022

img_map_placeholder

1031 S Delaware St, San Mateo, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sunnybrae Elementary School New MPR Building Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.