BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Brule, Wisconsin. Completed plans call for site work for a bridge / tunnel.

As of 09/30/2022 Olson Brothers construction won the bid for the high landing culvert and Tyler’s Excavating won the bed for the Danielson culvert for $7500. Start date will depend on when they can secure the required culvert could possibly be next spring As of 09/07/2022 Estimates are $35,000 for Highlanding and $18,000 for Danielson Culvert replacement on High Landing Road over a tributary to the Bois Brule River. Contractor to replace a 60" x 80' culvert with HDPE pipe. The outlet of this culvert is significantly perched above the streambed so to reduce scour and erosion at the outlet, additional riprap to armor the downstream channel is required by the DNR. This tributary flows into the Brule River which is a trout stream. If there is flow in the tributary at the culvert, the replacement work cannot take place between September 15th and May 15th. Culvert replacement on Danielson Rd over a tributary to Fisher Creek. Contractor to replace a 42" x 60' culvert with HDPE pipe. Fisher Creek is a warm water stream therefore work cannot take place between March 1st and June 15th. Permit coverage has already been secured from the WDNR under the Wetland and Waterway General Permit. All Best Management Practices for working in Navigable waterways must be followed. Replacement projects must also meet all WIS DOT specifications for backfill and riprap placement. For additional information or copies of the permits from the WDNR, contact either Diane Nelson 218-591- 0693 or Myron at 28-18-348-5014. The Town Board reserves the right to reject any or all bids and to accept the bid most advantageous to the Town of Brule. Bid Result Danielson Rd culvert replacement - Tyler’s Excavating LLC - $7,500.00 High Landing Rd culvert replacement - Olson Bros Contractors of Brule, WI - $29,150.45

Award

Bridges / Tunnels

$36,650.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
6
Bidding Soon
111
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 13, 2022

img_map_placeholder

Multiple Locations, Brule, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.