BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 21, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a power facility in Becancour, Quebec. Conceptual plans call for the renovation of a power facility.

Bécancour power plant - Engineering services for the replacement of fuel oil piping. TIMELINE: The owner has put the project on hold. Contract following RFP AM004417 was not awarded. Future of the project is undetermined. Coverage of this report has been discontinued.

Project Abandoned

Power Plant

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
220
Bidding Soon
2,904
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2023

Project location map

4900 route de la Centrale Nucléaire, Becancour, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.