BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Valparaiso, Indiana. Completed plans call for the renovation of a educational facility.

The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Contractor's Bond for Construction (Form 86A or AIA Form A312) in an amount equal to 110 percent of his contract price. In the case of the School Corporation, such bonds shall comply with all laws of the State of Indiana governing public contracts let by governmental units. Bids should be made on the form included in the Project Manual which is based on the Indiana State Board of Accounts Form 96 (Revised 2013), and shall be accompanied by an acceptable certified check, cashier's check, or bid bond, executed by the bidder and an acceptable surety company, payable to the order of the School Corporation, in an amount not less than five percent (5%) of the total bid. In the event any bidder withdraws his bid or fails to execute a satisfactory contract or contracts and furnish a satisfactory performance bond or bonds within ten (10) days after a contract or contracts has been awarded to such bidder by the School Corporation, said School Corporation may declare his certified check or cashier's check or bid bond forfeited to said School Corporation as liquidated damages. The School Corporation shall have the right: to accept any Bid within sixty (60) days after the time of opening of the Bids, during which time no Bids shall be withdrawn; at any time to reject any and all Bids; and to waive all formalities or irregularities in the bidding. (Question and Answer Period): Scheduled at 2:00 pm, local time, on September 15, 2022. Refer to Instructions to Bidders for more information. Contractors will be required to complete their work within a certain specified period as provided in Section 01 11 00 of the specifications. *Gough Inc. requests bids be submitted to: mvetor@goughinc.com no later than 2:00 PM, September 28, 2022.

Award

Educational

$8,486,500.00

Public - City

Renovation

78

31

71

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
83
Bidding Soon
1,851
All Active Projects
761
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

February 1, 2023

img_map_placeholder

260 S 500 W, Valparaiso, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.