BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a water / sewer project in Fuquay Varina, North Carolina. Working plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

**A Request for Proposals for CMaR is expected to be released in December 2022.** Terrible Creek WWTP treats sanitary sewer in the Neuse River Basin for Town of Fuquay-Varina sewer customers. In June of 2018, capacity of the plant was increased to 3 MGD, permitted to 6 MGD, and was anticipated to provide capacity until 2035. Robust growth in the service area already provides average daily flows >1.4 MGD and allocated not yet tributary flows exceed 80% of the 3 MGD capacity. Expansion is required to accommodate long-term capacity needs. This project will assess the existing assets (including equipment, structures, and buildings), design, permitting, and construction to upgrade Terrible Creek WWTP to a capacity of 6.0 MGD. The project scope of work generally includes, but is not limited to the following primary tasks: Addition of biological nutrient removal treatment basin and associated piping, equipment, and electrical apparatuses Addition of clarifier and associated piping, equipment, and electrical apparatuses Addition of disc filters and associated piping, equipment, and electrical apparatuses Evaluation/Rehabilitation of the belt filter presses Evaluation/Rehabilitation/Replacement of influent pumps, barscreen, and associated piping, equipment, and electrical apparatuses Evaluation/Rehabilitation/Replacement of preliminary treatment pumps, associated piping, equipment, and electrical apparatuses Addition of Secondary Clarifiers 1 & 2 weir covers Rehabilitation of the existing aeration basin diffuser membranes for replacement Evaluation/Rehabilitation of existing maintenance and storage facility size Evaluation/Rehabilitation of existing Administration building for 24/7/365 operations, laboratory, and staffing Evaluation/Rehabilitation/Replacement of chemical feed building and equipment improvements to support new treatment basin and clarifier Evaluation/Rehabilitation generator major service Installation of site service potable waterline from Hilltop Rd. Installation of "new" 36" effluent piping and abandonment of existing effluent piping Infrastructure evaluation to receive future wastewater through site from Hilltop Rd. service area to headworks Asset and Inventory Assessment of current and future equipment, for preventative maintenance scheduling to be created into CityWorks. Lifecycle assessments to be provided for best management practices, in relation to plant budgeting and capital improvement planning Questions pertaining to the selection process should be directed to Michael Wagner, MPA, Public Utilities Director at mwagner@fuquay-varina.org no later than 3:00 PM on September 26, 2022. ToFVPU shall not be held responsible for any oral instructions. Any changes to this Request for Qualifications (RFQ) will be in the form of an addendum, which will be furnished to all registered RFQ holders. Please register by email at mwagner@fuquayvarina.org and provide company name and contact information. ToFVPU reserves the right to reject any or all SOQ's to waive any informality or irregularity in any SOQ received, and to be the sole judge of the merits of the respective SOQ received. The selected Design Builder (DB) will form a team with ToFVPU and execute preliminary and final comprehensive agreements for design and construction to expand the Terrible Creek Wastewater Treatment Plant to 6 mgd for a total project cost not to exceeding the approved budget amount. Execute Construction Contract Fall 2024

Final Planning

Water / Sewer

$69,000,000.00

Public - City

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
70
Bidding Soon
1,239
All Active Projects
491
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

April 21, 2023

img_map_placeholder

5812 Hilltop Rd, Fuquay Varina, NC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.