Published December 20, 2022 at 7:00 PM

Updated January 25, 2024

Demolition, site work and addition to a civil project in New Braunfels, Texas. Completed plans call for site work for a water / sewer project; for the addition of a water / sewer project; and for the demolition of a water / sewer project.

New Braunfels Utilities ("NBU") invites the submittal of responses to this Request for Proposals ("RFP") from qualified firms interested in providing construction services in connection with the construction of Trinity Membrane Treatment Plant and Pump Station Expansion Project (the "Project"). The Project has been designed by Freese and Nichols, Inc. The Project is anticipated to include some or all of the following items within its scope: construction of (i) membrane treatment equipment inside an existing Membrane Building; (ii) a 1.5 million gallon ("MG") ground storage tank ("GST"); (iii) booster pump station expansion with six (6) new 1.5 million gallons per day ("MGD") horizontal split case pumps (including a 150 horsepower ("HP") motor, variable frequency drives ("VFDs"), and associated suction/discharge piping); (iv) approximately 1,500 linear feet ("LF") of new 24" diameter finished water line; (v) a new VFD building with electrical and heating, ventilation, and air conditioning ("HVAC") equipment; (vi) chemical feed equipment in an existing Chemical Building; (vii) an additional wet well connected to the existing Trinity Lift Station; (viii) three (3) new generators; (ix) replacement of five (5) programmable logic controller ("PLC") cabinets; (x) control system upgrades at the Enclave Lift Station; (xi) storm water pollution prevention; (xii) paving and site work; and (xiii) all other appurtenances necessary to complete the Project. NBU has established a target commencement date for construction activities of the Project as December 15, 2022. The projected completion date is estimated to be five hundred thirty-six (536) calendar days from the Notice to Proceed date. NBU reserves the right to phase the construction of the Project or modify the schedule as needed and determined by the NBU Board or staff due to modifications in scope. NBU shall accept requests for additional information or clarification concerning this RFP on or before 4:00 P.M. CST, October 24, 2022. NBU shall not answer any questions submitted after 4:00 P.M. CST, October 24, 2022. Project No. 2033/001036

Award

Water / Sewer

$20,769,000.00

Public - City

Addition, Demolition, Site Work

171

48

73

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
132
Bidding Soon
2,532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

January 3, 2023

Project location map

3295 Westpointe Dr, New Braunfels, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.