BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in Boulder, Colorado. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

University of Colorado athletic department is renovating Potts Track and Prentup Field. There are multiple distinct project scopes that are being advertised for CM/GC services under this RFP solicitation. The University at its sole discretion may award these projects to one or multiple contractors. Construction start is anticipated for Spring 2023 and completion by August 2023 prior to the 2023 fall soccer season at Prentup field and the 2024 PAC12 track and field championship at Potts track. High level project details are as follows: Prentup Field Lighting o Install new field lighting at the perimeter of soccer field o Install speakers to the proposed light poles to provide a permanent sound system o Provide improvements to support media broadcasting o Modify irrigation system and replace field sod Potts Track Renovation o Replace track surface and modify existing track cross slope to reflect NCAA standards. Extent of subgrade modifications to be determined after analysis. o Various track and field modifications to accommodate the needs of CU Athletics Restroom and Concessions Building and Ski Building Restroom Renovation o Approximately 3000SF new mixed-use concessions, storage and restroom building between Prentup and Potts Fields o Reconfigure existing ski building restroom with revised stall layouts and entrance location o New ski building restroom finishes to update space For purposes of this solicitation, assume the following for anticipated construction costs for each project. UCB000687 - Prentup Field $2.0M UCB000686 - Potts Track $2.5M UCB000712 - Concessions Building $1M Date Email Questions Due September 30 th , 2022 @ 2PM Date Email Answers Issued October 5 th , 2022 Anticipated Construction Start/Finish April 2023 - December 2023 Respondent initiated email requests for clarification will be received any time on or before to September 30 th , 2022 @ 2PM. All State responses will be issued by email addenda on or before October 5 th , 2022 @ 2PM.

Post-Bid

Playgrounds / Parks / Athletic Fields

$5,500,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
35
Bidding Soon
923
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2022

April 3, 2023

img_map_placeholder

3415 Colorado Ave, Boulder, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.