BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a communication facility in Harrisburg, Pennsylvania. Working plans call for site work for a communication facility.

The owner has selected a Design Builder.  Contract No T-148.06S001-3-02 Revise the Diverse Business minimum level of participation to 9%. ADD2(EN-00232-03-04)14OCT22 This project provides for the furnishing of all labor, material, equipment and work necessary to design and construct a fiber optic network from the Western Regional Office (MP G-0.55) to the Gettysburg Pike Interchange (MP 236.00). Work items include, but are not limited to: o Design of fiber optic network to include a backbone and distribution fiber optic cable to various demarcations sites. o Design of fiber optic network to include commercialization fiber optic cable to the limits of the project. o Design, procure, and install all required fiber optic cable, conduit, crossings, and junction boxes. o Install, splice, and test fiber optic cable as required. o Design, procure, and construct conduit and cable attachments to structures. o Obtain all applicable permits. o Conduct agency, utility, and railroad coordination as required. o Maintenance and Protection of Traffic o Erosion and Sedimentation Control Milepost 0.00 is located at the interchange of US 119 and PA Turnpike 66, Milepost G-0.55 is located at the Western Regional Office in the vicinity of Arona Road Interchange, Exit 1, on the Amos K. Hutchinson Bypass (PA Turnpike 66), Milepost 75.00 is located in the vicinity of New Stanton Interchange, Exit 75, and Milepost 236.00 is located in the vicinity of the Gettysburg Pike Interchange, Exit 236, in Westmoreland, Somerset, Bedford, Fulton, Huntingdon, Franklin, and Cumberland Counties. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) A Prequalification Certification in work classification code P4 or designation as a General Highway Contractor and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The opening and listing of bids not meeting all the terms and conditions of the bid advertisement or bid procedures does not act as a waiver or modification of any requirements contained in the bid advertisement or bid procedure. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Design/build Project for Fiber Optic Network Installation Between Milepost G-0.00 and Milepost G-0.55 and Milepost 75.00 and Milepost 236.00 in Westmoreland, Somerset, Bedford, Fulton, Huntingdon, Franklin, and Cumberland Counties The Diverse Business minimum level of participation established for this project is: DB 13%

Pre-Construction/Negotiated

Communication

$163,756,100.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
196
Bidding Soon
2,490
All Active Projects
1,043
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 2, 2022

March 2, 2023

img_map_placeholder

Multiple Locations, Harrisburg, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.