Site work and paving for a civil project in Marysville, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of November 21, 2022, this project has been awarded to McClure and Sons, Inc., in the amount of $3,238,504.03. The major items of work to be accomplished for this project con-sist of modifications and additions to the City of Marysville's Wastewater Treatment Plant (WWTIP), including but not limited to the following: 1. Measures ibr temporary erosion and sediment. control. 2. Asphalt; pavement demolition. and repair. 3. Furnishing and installing a precast concrete vault, including associated demolition of the existing 36-inch secondary effluent. (SE) pipeline, excavation, shoring, dewatering, connection of the existing 36-inch SE pipeline to the vault, backfill, compaction, and. surface restoration. 4. Furnishing and installing a trash rack, band screen, and grating in the precast concrete vault. 5. Furnishing and installing a screenings compactor, including associated drain piping and concrete pad with excavation and sub-grade preparation. 6. Furnishing and installing a new screen control panel including connecting power and control between the new panel and the new screen, compactor, level transmitters, solenoid valves, and flow meters; connecting power to the panel from MCCo450; and net-working the PLC with CP-450. 7. Constructing a new concrete pad with drain piping for placement of a screenings dumpster including excavation and subgrade preparation. 8. Furnishing and installing two-piece mechanical plugs to isolate the flow path between Manholes #1 and #2. 9. Furnishing and installing new non-potable water piping to provide water service to the new screen and compactor included associated trenching, backfill, compaction, surface restoration, heat tracing, and insulation. 10, Providing a new suction pipeline off the existing filter feed pumps discharge header to supply lagoon effluent, to the new strainer booster pump including associated fittings, pipe penetrations, valves, supports, trenching, backfilling, compaction, and surface restoration, 11. Furnishing and installing a new strainer booster pump including associated valves and instruments. 12. Furnishing and installing two new automatic strainers including associated backwash booster pump, piping, fittings, valves, and instruments. 13. Constructing a new concrete pad. for placement, of the strainer booster pump, automatic strainers, and backwash booster pump including excavation and subgrade preparation. 14. Constructing a new electrical shelter including lighting, excavation, subgrade preparation, and concrete foundation. 15. Providing a new strain-er discharge header to the filter influent channel for discharge of strained lagoon effluent to the existing sand. filters including associated fittings, pipe penetrations, valves, and pipe supports. 16. Furnishing and installing a new strainer control panel including connecting power and control between the new panel and the new automatic strainers and backwash booster pump, connecting power to the panel from MCC-450, and networking the PLC with CP-450. 17. Furnishing and installing a new VFD for the strainer booster pump including a concrete equipment pad, enclosure, connecting power from existing MCC-450, connecting power and controls between the VFD to the strain-er booster pump, and connecting controls to the new screen control panel. 18. Furnishing and installing a new air gap local control panel with remote I/O, VFDs for each air gap pump, and pressure transmitter switch device for control of the air gap pumps. 19. Furnishing and installing yard lighting. 20. Additional programming to the new local strainer control panel PLC by the Systems Integrator to control the strainer booster pump and integrate new instruments. 21. Programming within the existing CP-450 PLC to modify control of existing gates. 22. Programming within the Filter Reject Control Panel PLC to add remote control of the air gap pumps. 23. Modify the existing SCADA programming to integrate the new equipment. and processes. 24. Connecting and networking the new strainer control panel PLC and the new screen control panel PLC with the existing CP-45() PLC. 25. Connecting and networking the new air gap control panel remote I/O with the existing network cabinet, in the Lab Building. 26. Conduct startup and testing of the new screening, straining, and air gap systems. All work must be completed in accordance with the Contract Documents and the Contractor must comply with all applicable federal, state, and local laws and regulations. Each bid must be accompanied by a certified check, cashiers check, or bid bond (with an authorized surety company as sure-ty) made payable to the City of Marysville in an amount not less than five percent (5%) of the bid amount.
Award
Water / Sewer
$3,238,504.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2022
December 12, 2022
Multiple Locations, Marysville, WA
Related To This Project
Marysville, WA
Bid Date: Apr 10 2024
Marysville, WA
Bid Date: Oct 13 2022
Marysville, WA
--
Marysville, WA
Bid Date: Oct 12 2022
Marysville, WA
Bid Date: Nov 08 2022
Marysville, WA
Bid Date: Oct 07 2022
Marysville, WA
Bid Date: Nov 16 2022
Marysville, WA
Bid Date: Dec 12 2022
Marysville, WA
Bid Date: Nov 02 2022
Olympia, WA
--
East Wenatchee, WA
Bid Date: Nov 21 2022
Seattle, WA
--
Everett, WA
Bid Date: Sep 01 2022
Arlington, WA
Bid Date: Aug 30 2022
Keyport, WA
Bid Date: Oct 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.