Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Gonzales, Louisiana. Contact the soliciting agency for additional information.
Professional engineering and planning firms interested in performing professional engineering services at the Louisiana Regional Airport, Gonzales, LA for the project period of approximately 3 years with the option for two, one-year extensions. Projects are to be submitted to the Federal Aviation Administration and LADOTD Division for approval. The project description [includes]: 1. Terminal Apron Expansion 2. Terminal Apron Reconstruction 3. Terminal Apron Rehabilitation 4. South Apron Expansion 5. Airfield Pavement Sealcoat 6. Airfield Pavement Marking 7. Drainage Improvements 8. Hangar Development 9. Hangar Rehabilitation 10. Airfield Access Improvements 11. Obstruction Mitigation 12. Fuel System Improvements 13. Approach Lighting System And Navigational Aids Improvements 14. Airport Layout Plan Updates 15. Airfield Utility Service Improvements The scope of services may include topographic surveys and preliminary investigations, preparation of preliminary and final construction plans and specifications, cost estimates, grant management, construction administration, resident inspection and other special services. [These projects are] to include project administrative procedures and any additional projects that are funded within the timeframe of the professional services contract. Project implementation is totally dependent upon FAA and DOTD funding. Firms interested in performing these services shall furnish 3 copies of their statement of qualifications on a Standard Form 330 (SF 330). Scoring of the selection criteria shall be on a numerical scale of 1 to 5, with 5 being the highest possible score and 1 being the lowest possible score. The score for each criterion will be multiplied by its weight factor, which indicates the importance of each criterion as it relates to this contract. The criteria and weighting factors to be used by the Sponsor in evaluating responses will be as follows: General Firm Information Sub-Consultants Information Experience Firm/Sub consultants - weight value - 5 Experience- Key Staff -weight value - 5 Past Performance - weight value - 1 Current Work Load - weight value of 3 Firm Size & Technical Disciplines - weighted value - 1 Location - weighted value - 1 Following the evaluation of the Statements of Qualifications received by the Sponsors selection committee, the top three (3) applicants shall be placed on a short list. It shall be the option of the sponsor, if the sponsor or selection committee feels further evaluation of the qualified short list applicants is necessary in order to determine the top-ranked firm, to issue a Request for Proposals (RFP) to all short list applicants. The RFP issued to all short list applicants shall contain instructions on the format (such as written proposal, interview, presentation, etc.) to be used in submitting proposals and information on how the proposals will be evaluated. Following the final evaluation of qualified applicants, the Sponsor will place the applicants in a final ranking based on qualifications. The Sponsor will then enter fee negotiations with the top-ranked firm for the contract, with the unsuccessful firms being notified accordingly. Should these negotiations be unsuccessful, the Sponsor shall enter negotiations with the next-highest ranked firm, and so on. The Sponsor reserves the right to reject all applicants and re-advertise for the contract. The successful firm will be required to execute a standard DOTD/Division of Aviation type of contract in conformance with all city, parish, DOTD, and FAA guidelines, standards, and assurances. Questions regarding this project should be addressed to the airport manager. Firms wishing to apply must submit a fully completed SF-330 Form. Failure to provide all information requested might result in the submission being considered non-responsive and the firm will not be given a total score in the evaluation process. Ascension - St. James Airport and Transportation Authority (225)644-1959
Conceptual
Transportation Terminals
Public - County
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2023
6255 Airport Industrial Rd, Gonzales, LA
Related To This Project
Gonzales, LA
--
Gonzales, LA
Bid Date: Aug 28 2019
Gonzales, LA
Bid Date: Jun 23 2021
Gonzales, LA
Bid Date: Aug 23 2022
Gonzales, LA
Bid Date: Dec 17 2020
Gonzales, LA
Bid Date: Aug 09 2022
Gonzales, LA
Bid Date: Jul 20 2022
Gonzales, LA
Bid Date: Jul 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.