BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Gonzales, Louisiana. Contact the soliciting agency for additional information.

Professional engineering and planning firms interested in performing professional engineering services at the Louisiana Regional Airport, Gonzales, LA for the project period of approximately 3 years with the option for two, one-year extensions. Projects are to be submitted to the Federal Aviation Administration and LADOTD Division for approval. The project description [includes]: 1. Terminal Apron Expansion 2. Terminal Apron Reconstruction 3. Terminal Apron Rehabilitation 4. South Apron Expansion 5. Airfield Pavement Sealcoat 6. Airfield Pavement Marking 7. Drainage Improvements 8. Hangar Development 9. Hangar Rehabilitation 10. Airfield Access Improvements 11. Obstruction Mitigation 12. Fuel System Improvements 13. Approach Lighting System And Navigational Aids Improvements 14. Airport Layout Plan Updates 15. Airfield Utility Service Improvements The scope of services may include topographic surveys and preliminary investigations, preparation of preliminary and final construction plans and specifications, cost estimates, grant management, construction administration, resident inspection and other special services. [These projects are] to include project administrative procedures and any additional projects that are funded within the timeframe of the professional services contract. Project implementation is totally dependent upon FAA and DOTD funding. Firms interested in performing these services shall furnish 3 copies of their statement of qualifications on a Standard Form 330 (SF 330). Scoring of the selection criteria shall be on a numerical scale of 1 to 5, with 5 being the highest possible score and 1 being the lowest possible score. The score for each criterion will be multiplied by its weight factor, which indicates the importance of each criterion as it relates to this contract. The criteria and weighting factors to be used by the Sponsor in evaluating responses will be as follows: General Firm Information Sub-Consultants Information Experience Firm/Sub consultants - weight value - 5 Experience- Key Staff -weight value - 5 Past Performance - weight value - 1 Current Work Load - weight value of 3 Firm Size & Technical Disciplines - weighted value - 1 Location - weighted value - 1 Following the evaluation of the Statements of Qualifications received by the Sponsors selection committee, the top three (3) applicants shall be placed on a short list. It shall be the option of the sponsor, if the sponsor or selection committee feels further evaluation of the qualified short list applicants is necessary in order to determine the top-ranked firm, to issue a Request for Proposals (RFP) to all short list applicants. The RFP issued to all short list applicants shall contain instructions on the format (such as written proposal, interview, presentation, etc.) to be used in submitting proposals and information on how the proposals will be evaluated. Following the final evaluation of qualified applicants, the Sponsor will place the applicants in a final ranking based on qualifications. The Sponsor will then enter fee negotiations with the top-ranked firm for the contract, with the unsuccessful firms being notified accordingly. Should these negotiations be unsuccessful, the Sponsor shall enter negotiations with the next-highest ranked firm, and so on. The Sponsor reserves the right to reject all applicants and re-advertise for the contract. The successful firm will be required to execute a standard DOTD/Division of Aviation type of contract in conformance with all city, parish, DOTD, and FAA guidelines, standards, and assurances. Questions regarding this project should be addressed to the airport manager. Firms wishing to apply must submit a fully completed SF-330 Form. Failure to provide all information requested might result in the submission being considered non-responsive and the firm will not be given a total score in the evaluation process. Ascension - St. James Airport and Transportation Authority (225)644-1959

Conceptual

Transportation Terminals

Public - County

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
97
Bidding Soon
1,181
All Active Projects
618
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 2, 2023

img_map_placeholder

6255 Airport Industrial Rd, Gonzales, LA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.