BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an elderly care / assisted living facility in Farmington, New York. Completed plans call for the renovation of a elderly care / assisted living facility.

Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 30 days after completion of project County(ies): Ontario Location: Martz IRA, 5700 Martz Rd, Farmington, NY 14425 Question Deadline 09/29/2022 Summary of work- Completely install generator and transfer switch for residence SCOPE: DG014 263-FLA-2550 DESCRIPTION: Generator and Transfer Switch Installation at Residence. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural / engineered drawings. Work is to be completed within 60 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Generator Installation, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Furnish materials and labor to Completely Install the Generator and Transfer Switch System as Per this scope. 2. Remove existing generator and install new 38 KW in it place 3. Remove existing x fer switch and install new 400Amp rated x fer switch in its place 4. Verify there are enough existing control wires , if not pull in proper control cables 5. Upon completed installation, vendor must complete "Installation/Pre-Startup Check Sheet" and submit to Emergency Power Systems (EPS). A technician will be assigned to the job to review the work and start-up of generator for warranty purposes. 6. Vendor must also contact Middleton Engineering for review of services performed. 7. All work will be inspected by: Middle Department Inspection Agency, and coordinated by FLDDSO Maintenance Point of Contact listed above. Please notify contact when inspection can be completed. Inspection documents must be submitted to the DDSO contact listed above before payment will be processed. 8. No splicing of service conductors is allowed in the system. Lug to lug connections are strictly enforced. 9. Panels must be re-wired as sub-panels for isolating neutrals. 10. All work to be done per New York State, Federal Regulations, and 2014 NEC code. 11. Test and tune equipment for optimal performance. Submit startup documentation for warranty verification. 12. Generator and Transfer switch to be picked up by vendor @ Newark Transportation Building, Newark, NY. 13. No payment will be processed until all necessary documentation and inspections are satisfactorily on file. 14. Work to be completed and invoiced within 60 days of receipt of P.O

Bid Results

Elderly Care / Assisted Living

$4,990.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
57
Bidding Soon
1,100
All Active Projects
578
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

November 3, 2022

img_map_placeholder

5700 Martz Rd, Farmington, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.