Published November 4, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in St Petersburg, Florida. Working plans call for site work for a three-story above grade water / sewer project.

As per the Owner all bids have been rejected. Editorial Content Team is actively seeking updated information Counties: Pinellas Road Name: I-275/US 19 at N Skyway - Water Storage Tank Limits: 15170000 Project(s): 44804515201(*) Federal Aid No: N/A Total Roadway Length: 0.122 Miles Contract Days: 100 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.122 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Acquisition Days Lump Sum The Improvements under this Contract consist of constructing a 16,360-gallon cast in place concrete water storage tank. The tank will be located on FDOT owned rest area property along the I-275 / US 19 N. Skyway. That tank will be filled with potable water by connecting a new 2-inch tank fill pipe to the existing 2.5-inch FDOT owned watermain. Work items include: mobilization, clearing and grubbing, maintenance of traffic, sediment barrier, staked turbidity barrier, excavation for structures, cast in place concrete, reinforcing steel, utility piping and fittings, valve assemblies and meter box, tank access hatch and aluminum railing, tank exterior and interior ladder, performance turf, mowing, fencing, and litter removal in Pinellas County. Contractors must submit with their bid Form 850-070-09 Experience in Landscaping or be Pre-Qualified in Landscaping. Prequalification per Rule 14-22 is not required. A Builder's License or General Contractor's License is required for this project. For buildings three (3) stories or less in height, a Builder's License or General Contractor's License is acceptable. Buildings more than 3 stories in height require a General Contractor's License. This building is less than 3 stories in height. A copy of the license must be received prior to Award. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects unless noted otherwise in the project specifications. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 I-275/US 19 at N Skyway - Water Storage Tank Proposal Budget Estimate: $443,700.00

Final Planning

Water / Sewer

$525,706.00

Public - State/Provincial

Site Work

21

11

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
112
Bidding Soon
1,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

November 11, 2022

Project location map

I-275, St Petersburg, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.