BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a clubhouse / community center in Colchester, Connecticut. Completed plans call for the construction of a 14,210-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

All prospective bidders are urged to attend.A bid bond for five percent (5%) of the base bid cost is required and must accompany each proposal. Bids must be held finn for ninety (90) days beyond the bid opening date.The successful bidder must file a one hundred percent (100%) Performance Bond, a one hundred percent (100%)Labor& Materials Bond and a Certificate of Insurance with the Purchasing Agent within ten (10) days of notice of bid award.Attention of bidders is directed to certain requirements of this contract which require payment of minimum wages and compliance with certain local, state, and federal requirements. Each bidder is responsible for checking the website to determine if any addenda have been issued.In accordance with Connecticut General Statute Sections 4a-100 and 4b-91 , a responsible bid must contain two (2) documents: The Contractor Prequalification Certificate and the Update (Bid) Statement. The classification GENERAL BUILDING CONSTRUCTION (GROUP B) is required as a minimum. This contract is subject to state contract compliance requirements, including non-discrimination statutes and set-aside requirements. State law requires a minimum of twenty-five percent (25%) of the state-funded portion of the contract be set aside for a ward to subcontractors holding current certification as Small Business Enterprises (SBE) from the CT Department of Administrative Services (DAS). A minimum of six and one-quarter percent (6.25%) of the state-funded portion must be set aside for subcontractors holding current DAS certification as Minority-, Women-, and/or Disabled owned businesses (M/W/DisBE). The Contractor must demonstrate good faith effort to meet the twenty-five percent (25%) set-aside goals.The Town of Colchester reserves the right to reject any and all bids or any part thereof, or to waive defects in same, or to accept any proposal, or part thereof, deemed to be in the best interest of the Town of Colchester for whatever reason.

Under Construction

Clubhouse / Community Centers

$8,625,000.00

Public - City

New Construction, Site Work

135

30

29

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
255
Bidding Soon
3,601
All Active Projects
1,545
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

March 13, 2023

img_map_placeholder

15 Louis Ln, Colchester, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.