BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Covington, Washington. Completed plans call for site work for a water / sewer project.

19497 TASK 02 Furnishing the Necessary Labor, Materials, Equipment, Tools, and Guarantees Thereof to Construct the Tamarack Pond Rehabilitation. the Project Consists of Partial Filling of the Existing Tamarack Detention Pond, Constructing New Conveyance Piping and Structures to Allow Routing Flows to the Reserve Detention Pond. All Proposals Must Be Accompanied by a Certified Check, Postal Money Order, Cashiers Check, or Proposal Bond Payable to the "city of Covington" and in an Amount of Not Less Than Five Percent (5%) of the Total Proposal Amount. The Work Shall Be Substantially Complete Within 25 Working Days After the Commencement Date Stated in the Notice to Proceed. All Bidding and Construction is to Be Performed in Compliance With the Contract Provisions and Contract Plans for This Project, and Any Addenda Issued Thereto, That Are on File at the Office of the City Clerk, Covington City Hall in Covington, Washington. Contract Questions Shall Be Directed Only to the Office of the Project Engineer. Financing of the Project Has Been Provided by City of Covington, Washington. The City of Covington Expressly Reserves the Right to Reject Any or All Proposals and to Waive Minor Irregularities or Informalities in Any Proposal. Davis Bacon Act applied to this contract. Subject to any extensions of the Contract Time granted under the Contract, the undersigned agrees to substantially complete the Work required under this Contract within 25 working days (the Substantial Completion Date) and to physically complete the Work required under this contract within 35 working days (the Physical Completion Date) from when Contract Time begins. The undersigned has reviewed and fully understands the provisions in the Contract regarding liquidated damages and agrees that liquidated damages shall be $1,000.00 per day for each and every working day beyond the Contract Time allowed for substantial completion until the Substantial Completion Date is achieved and $500.00 for each and every working day required beyond the Contract Time for physical completion until the Physical Completion Date is achieved

Award

Water / Sewer

$408,000.00

Public - City

Site Work

18

13

10

8

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
834
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 31, 2022

img_map_placeholder

161st Pl SE, Covington, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.