Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2022 at 8:00 PM

Updated June 15, 2024

Site work and paving for a mixed-use development in Louisville, Kentucky. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Metro Parks and Recreation is requesting bids constructing pickle ball courts at McNeely Lake Park, 6994 Cooper Chapel Road, Louisville, KY 40229. This project includes but not limited to: Grading, asphalt paving, sports court installation, install fence, and extend existing park sidewalk as shown on the plans. 0.5% Handicapped Owned Business Set Aside

Bid Results

Sidewalks / Parking Lot

$200,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
111
Bidding Soon
1,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 31, 2022

Project location map

6994 Cooper Chapel Rd, Louisville, KY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed