BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Port Arthur, Texas. Completed plans call for the renovation of a military facility.

United States Coast Guard Station Sabine is accepting proposals for qualified individuals or firms to replace Indoor Refrigeration Head at Station Sabine. The indoor refrigeration head must be like in kind to ensure there are no configuration changes to the system. The current head is a BELO head. United States Coast Guard Station Sabine is accepting proposals for qualified individuals or firms to replace Indoor Refrigeration Head at Station Sabine. The indoor refrigeration head must be like in kind to ensure there are no configuration changes to the system. The current head is a BELO head. (See Performance Work Statement) Federal Acquisition Regulation Clauses and Department of Labor wage rates for construction are included in this solicitation and are applicable. This solicitation will result in a Firm-Fixed Price contract awarded to the offeror with the Lowest Price Vendors doing business with the Coast Guard must be registered or be willing to register with the Sam registration at W.W.W. SAM.Gov NAICS: 238220 PCS: Z2NB Please submit offers to Cesar.A.Tamayo@uscg.mil by c.o.b. 3:00 pm CST, Asap. General: United States Coast Guard Station Sabine is accepting proposals for qualified individuals or firms to replace Indoor Refrigeration Head at Station Sabine. The indoor refrigeration head must be like in kind to ensure there are no configuration changes to the system. The current head is a BELO head. Location: United States Coast Guard Station Sabine 7034 South 1st Street Sabine Pass, TX 77655 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility's normal operations. Normal operating hours are from 8:00am to 4:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MK1 Terence Totten Terence.L.Totten@uscg.mil 713-805-4339 MKC James Johnson James.C.Johnson2@uscg.mil 409-971-2200 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of by contractor. V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer's Representative of lost time due to accidents is required. Provide two copies of workman's compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. VI. Inspection: The Contracting Officer's Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor. VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor's materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor's expense. VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification. IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government. VIII: SCOPE OF WORK: Contractor shall provide all materials necessary to STA Sabine: ITEM NAME BELO indoor refrigeration head or Comparable LOCATION: USCG STA SABINE 7034 South 1st Street Sabine Pass, TX 77655 All Materials as provided by contractor must be complete, comparable to existing and approved by Contracting Officer Install new BELO head or comparable, reconnect lines and electrical, flush lines with nitrogen and R-11 Purge. Install new refrigeration drier. Secure new bulb to line and insulate. Vacuum system to 500 microns, purge and repull pull second vacuum. Start- up system and check operation. Record all information into Service Titan and complete start up sheet. 2. REFERENCES COAST GUARD DRAWINGS None. OTHER REFERENCES None. 3. REQUIREMENTS 3.1 General. MANUFACTURER: N/A CHARACTERISTICS: BELO Indoor refrigeration head WARRANTY: A. Standard Manufacturer's Warranty for all replacement parts and materials GOVERNMENT ACCEPTANCE: Acceptance will be made at destination by a Government representative. Acceptance will be contingent upon the representative's verification of product and workmanship. FOR OFFICIAL USE ONLY

Post-Bid

Military

$1,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
10
Bidding Soon
399
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2022

October 26, 2022

img_map_placeholder

7034 S 1st Ave, Port Arthur, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.