Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Bellflower, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
For Bellflower Boulevard Complete Streets Project from Artesia Boulevard to South City Limit Each bid must be accompanied by a certified or cashiers check or bidders bond payable to the order of the City of Bellflower or cash for an amount not less than ten percent (10%) of the bid price submitted, and the check, bond, or cash deposit of the successful bidder shall be forfeited to the City if such bidder fails to enter into the contract to perform the work within ten (10) days after written notice of award. Bids will not be accepted after that time. As described in the bidding documents, the bids are for a public works project (project) which consists of the bellflower boulevard complete streets project from artesia boulevard to south city limit and related work as shown on the plans on file with the citys public works department. At the time of contract award, the contractor shall possess a Class A Contractors License. No bid will be accepted from a contractor who has not been licensed in accordance with the Provisions of Chapter 9, Division III, of the Business and Professions Code of the State of California at the time the bid is submitted. Following the issuance of the Notice to Proceed, the contractor shall have ninety (90) working days to complete the work. This project requires payment of State prevailing rates of wages for Los Angeles County or the Davis Bacon Act Federal Wage Rates, whichever is higher. The contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. Note that the Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code 1725.5 and 1771.4, to be nonresponsive. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor's request.
Award
Roads / Highways
$1,717,237.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2022
November 28, 2022
Bellflower Blvd, Bellflower, CA
Related To This Project
Bellflower, CA
Bid Date: Dec 22 2022
Bellflower, CA
Bid Date: Oct 25 2019
Bellflower, CA
Bid Date: Jul 22 2021
Bellflower, CA
Bid Date: Oct 20 2021
Bellflower, CA
Bid Date: May 24 2022
Bellflower, CA
Bid Date: Jul 28 2022
Bellflower, CA
Bid Date: Aug 22 2022
Bellflower, CA
Bid Date: Aug 18 2022
Bellflower, CA
Bid Date: Oct 25 2022
Bellflower, CA
Bid Date: Oct 18 2022
Bellflower, CA
Bid Date: Oct 20 2022
Bakersfield, CA
Bid Date: Dec 31 2022
Los Angeles, CA
Bid Date: Nov 08 2022
San Francisco, CA
Bid Date: Jan 11 2023
Ontario, CA
Bid Date: Dec 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.