BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of a mixed-use development in Maryville, Tennessee. Completed plans call for the renovation of a educational facility; and laboratory facility.

Renovation of the Eagleton College and Career Academy (ECCA) Science Labs Question Cuttoff Date & Time 9/16/2022 05:00:00 PM (ET) A RENOVATION OF (3) EXISTING CLASSROOMS INTO NEW BIOLOGY, CHEMISTY, AND PHYSICS LABS. INCLUDES (2) NEW TEACHER WORKROOMS. The work shall include selective demolition, building construction, plumbing, heating, ventilating and air conditioning; electrical work; special equipment as specified; furnishings, and site improvements as shown and specified. C. Patch any existing work damaged by construction.

Post-Bid

Laboratories

$1,200,000.00

Public - County

Renovation

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
87
Bidding Soon
837
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 31, 2022

Project location map

2610 Cinema Dr, Maryville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.