Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, outdoor lighting and new construction of a mixed-use development in Sarasota, Florida. Completed plans call for the construction of a 800-square-foot transportation facility; for site work for a transportation facility; for outdoor lighting for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
FDOT FM No. 444678-1-94-01 BID-09-2022-GTC The project includes the reconstruction and expansion of the existing Ground Transportation Center (GTC). There are three major segments to the GTC. The east segment consists of a pick-up loop for taxis, shuttles and limos and an 800 square foot drivers building. The central segment includes a pick-up loop for Transportation Network Companies (Uber, Lyft, etc.) and adjacent parking area. The west segment includes a pick-up/ drop-off loop for transit. The major work elements of the project include construction of drivers building, associated sanitary and potable water utilities, asphalt pavement, concrete sidewalks, canopies, signing and marking, landscaping, lighting, communications, and drainage upgrades. Bid security in the form of a bid bond equal to 5% of the total bid made payable to the Sarasota Manatee Airport Authority is required. Contract security in the form of 100% Performance and Payment Bonds will be required.
Award
Sidewalks / Parking Lot
$6,417,529.00
Public - State/Provincial
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 28, 2022
December 1, 2022
6000 Airport Cir, Sarasota, FL
Related To This Project
Sarasota, FL
Bid Date: Dec 06 2022
Sarasota, FL
Bid Date: Aug 31 2022
Sarasota, FL
Bid Date: Nov 10 2022
Sarasota, FL
--
Sarasota, FL
--
Sarasota, FL
--
Sarasota, FL
Bid Date: Nov 01 2022
Sarasota, FL
Bid Date: Nov 18 2022
Sarasota, FL
Bid Date: Oct 19 2022
Sarasota, FL
Bid Date: Oct 03 2022
Sarasota, FL
Bid Date: Jan 20 2023
Sarasota, FL
Bid Date: Jan 17 2023
Sarasota, FL
Bid Date: Dec 07 2022
Keystone Heights, FL
Bid Date: Nov 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.