BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in Sarasota, Florida. Completed plans call for the construction of a 800-square-foot transportation facility; for site work for a transportation facility; for outdoor lighting for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

FDOT FM No. 444678-1-94-01 BID-09-2022-GTC The project includes the reconstruction and expansion of the existing Ground Transportation Center (GTC). There are three major segments to the GTC. The east segment consists of a pick-up loop for taxis, shuttles and limos and an 800 square foot drivers building. The central segment includes a pick-up loop for Transportation Network Companies (Uber, Lyft, etc.) and adjacent parking area. The west segment includes a pick-up/ drop-off loop for transit. The major work elements of the project include construction of drivers building, associated sanitary and potable water utilities, asphalt pavement, concrete sidewalks, canopies, signing and marking, landscaping, lighting, communications, and drainage upgrades. Bid security in the form of a bid bond equal to 5% of the total bid made payable to the Sarasota Manatee Airport Authority is required. Contract security in the form of 100% Performance and Payment Bonds will be required.

Award

Sidewalks / Parking Lot

$6,417,529.00

Public - State/Provincial

New Construction, Outdoor Lighting, Paving, Site Work

88

28

12

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
34
Bidding Soon
974
All Active Projects
393
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2022

December 1, 2022

img_map_placeholder

6000 Airport Cir, Sarasota, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.