BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Regina, Saskatchewan. Completed plans call for site work for a pipeline; road / highway; for paving for a road / highway; water / sewer project; and transportation facility.

SaskWater has engaged Associated Engineering (AE) to provide engineering services for the development of the Buffalo Pound Non-Potable Water Supply System (BPNPWSS) - Regina Regional Project. The proposed system will supply non-potable water from Buffalo Pound Lake to industrial customers in Regina's southwest and northeast regions. The pipeline length to be installed, with a completion date of 2024, is approximately 65 kilometres consisting of 600 mm diameter, 500 mm diameter and 400 mm diameter pipe with an approximate pressure rating of 1,860 kPa (275 psi). The RFP documents will be released with 70% drawings. The purpose of the RSFQ (first stage) is to shortlist Respondents for the second stage of the procurement process. The successful Respondent in the RFP process (second stage) will work with AE and SaskWater to complete the design, including choosing a pipe material. The project involves many road crossings, rail lines, highways, and utility lines. The anticipated construction start date is April 2023, and an expected completion date of December 2024. The Contractor shall be responsible for supplying and installing the pipe and appurtenances. The anticipated release of the RFP documents is in late October, closing in early December 2022. The project intends to release the RFP with a 70% design package without a chosen pipe type. The successful Respondent (Contractor)in the RFP process will be submitting their intended pipe type that can meet operational design criteria as part of the RFP process. Once the Contractor has been selected and a contract secured, they will be expected to collaborate with the Engineer and SaskWater to finalize the design for construction. The Contractor will be responsible for supplying and constructing the pipeline, with a final completion date of the end of 2024. Deadline for Questions: September 30, 2022 The anticipated construction start date is April 2023 and an expected completion date of December 2024.

Post-Bid

Pipeline

$20,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
6
Bidding Soon
98
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2022

April 3, 2023

img_map_placeholder

Multiple Locations, Regina, SK

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.