BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2023 at 7:00 PM

Updated April 9, 2025

Site work and new construction of a mixed-use development in North Riverside, Illinois. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; parking garage; and parking garage.

**As of January 3, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Notice is hereby given that the Forest Preserve District of Cook County (the District) is soliciting Bids for the above referenced project. The work includes, but is not limited to, demolition, construction of new HQ & Garage building, site improvements and renovation to existing buildings at the Salt Creek Landscape Maintenance site, and other related work as specified in the plans & specifications. During the bid process, all inquiries must be directed in writing and emailed to the Districts Purchasing Agent as follows: Email: fpd.purchasing@cookcountyil.gov All questions must be received in writing by 5:00 p.m. Tuesday, September 27, 2022. The District seeks the following participation goals with respect to Minority-owned Business Enterprises (MBE) and Women-owned Business Enterprises (WBE) for this project: 24 % MBE participation goal and a 10 % WBE participation goal Inspection window closes at 12:00 Noon and there is no other opportunity for this inspection. This determination is based upon the scope of work, estimated project cost and the availability of certified MBEs and WBEs that are certified to provide the type of work needed to successfully complete this project. Collectively, MBEs and WBEs shall be deemed MBE/WBEs. Submission of a Certificate of Intent to Comply with the Cook County Resident Employment is required for all construction projects over $100,000. Work shall be substantially completed within 360 calendar days from date that the District issues the Notice To Proceed. Substantial completion is the stage in the progress of the Work, as defined in the General Conditions, or a designated portion thereof, that is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. Liquated damages clause in Section GC-4(g) is applicable to the Work. The Contract shall end within 90 calendar days from the Substantial Completion date. When required, the bid shall be accompanied by a surety statement from a qualified Surety Agency indicating bidder's ability to obtain valid and enforceable Performance Bond and Payment Bond in the full amount of the bid, should the Contract be awarded to the Bidder. The actual bond shall be provided within fourteen (14) days of the notice of award. (Note: Refer to "IB-10. Bid Security - Section C" for Bond Rating and Financial Size Category requirements). Project No.: 19111047, 20-80-50

Post-Bid

Municipal

$2,800,000.00

Public - County

New Construction, Site Work

99

30

68

10

Subscribe For Documents

123 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
251
Bidding Soon
3,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2022

December 28, 2022

Project location map

2405 S 17th Ave, North Riverside, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.