BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in San Jose, California. Working plans call for the renovation of a water / sewer project.

The owner has selected 2 Design Builders, C. Overaa & Co., and Kiewit Infrastructure West Co. A timeline for construction has not yet been established. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A Yes Q&A Deadline 10/21/2022 5:00 PM (PDT) The Santa Clara Valley Water District (Valley Water) is soliciting qualifications and proposals from Design-Builders to design, construct, test, commission, and obtain governmental approvals for the Vasona Pump Station Upgrades Project (Project). Valley Water intends to award a single contract to a selected vendor to deliver the Project. The purpose of the Project is to replace and upgrade aging pumps, valves, standby power, motor control centers (MCCs), programmable logic controllers (PLCs), and controls and telemetry equipment to improve equipment maintenance and provide capacity to meet projected future demands. The Vasona Pump Station (VPS) is an existing facility located in the Town of Los Gatos, California (Project Site) and was constructed in the late 1960s and early 1970s. This facility is owned and operated by Valley Water. Operations are primarily implemented remotely, and maintenance involves testing the generator and checking the overall site for proper function approximately four times annually. VPS is a key component of Valley Water's raw water conveyance system and provides pressure boost via five pump scenarios within transmission pipelines, to convey water imported from the state Department of Water Resources' South Bay Aqueduct and the San Luis Reservoir, and local surface water from Anderson and Calero reservoirs to Valley Water's treatment plants and groundwater recharge facilities. This includes 155 cubic feet per second (cfs) from the Rinconada Water Treatment Plant, 120 cfs from the Santa Teresa Water Treatment Plant, and 62 cfs from the Penitencia Water Treatment Plant. Versatility of the VPS valve yard, located within the Project Site, allows for multiple pumping and gravity flow configurations used to transfer water between Central Pipeline, Almaden Valley Pipeline, and the Rinconada Force Main. Prequalification Conference No later than 3 weeks after issuance of RFQ. October 6, 2022 Deadline for Questions on RFQ No later than 2 weeks after Prequalification Conference or 9 calendar days before SOQs are due. October 21, 2022 Last day for Valley Water to issue addenda No later than 5 business days before SOQs are due. November 1, 2022 DocuSign Envelope ID: 1DFC8911-B224-45F9-A223-B6E8F0A49588 ADDENDUM NO. 2 VASONA PUMP STATION UPGRADES PROJECT Page 2 of 5 C0691 Deadline to submit SOQs No later than 1 week after Addenda are issued November 7, 2022 at 2:00 p.m. Valley Water notifies each Design-Builder by email of its SOQ ranking and posts list of proposed shortlisted DesignBuilders on website No later than 30 business days after SOQs are due. December 6, 2022 Deadline for Respondent to submit appeal No later than 3 days after issuance of preliminary shortlisted Design-Builders December 9, 2022 Valley Water issues appeals decision(s) No later than 7 business days after appeals heard. December 13, 2022 Valley Water finalizes and posts list of shortlisted DesignBuilders December 16,2022 RFP Issued to Shortlist Winter 2022 Technical Workshops and Confidential Commercial Meeting Winter 2022 Proposal Deadline Winter 2022 Notice of Award Spring 2023 Contract Negotiations Spring 2023 Notice to Proceed Summer 2023

Pre-Construction/Negotiated

Water / Sewer

$30,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
137
Bidding Soon
2,668
All Active Projects
1,097
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 7, 2022

June 1, 2023

img_map_placeholder

To Be Determined, San Jose, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.