BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Crystal Lake, Illinois. Completed plans call for the renovation of a playground / park / athletic field.

**As of November 07,2022, project was not awarded, no information for rebid.** The contract will be awarded at a Board Meeting of the Park Board of Commissioners on October 20th, 2022, at 6:30 p.m. 2. DESCRIPTION OF THE WORK - The scope of work involves furnishing all of the required labor, materials, equipment, implements, parts and supplies necessary for, or appurtenant to, Epoxy Maintenance Garage Floor in accordance with the specifications dated September 8th, 2022, and any authorized change orders which have been signed by both parties. 3. INSTRUCTIONS TO BIDDERS - All proposals must be accompanied by a Bidder's Bond, a Certified Check, Cashier's Check or Bank Draft for 10% (ten percent) of the total bid made payable to Crystal Lake Park District. Each bid shall also include three (3) references of clients for which similar work was performed, listing the name, address and telephone number of the client, a description of the work, and the construction cost. 4. ILLINOIS PREVAILING WAGE ACT - All contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The Crystal Lake Park District reserves the right to reject any and all bids and to waive technicalities. Dated at Crystal Lake, Illinois, this 8th day of September, 2022. /s/ Jason Herbster Secretary Mechanically scrub floor using detergent and oil emulsifiers to clean and remove oils. - Shot blast/ grind floor to remove contaminants and create a profile. - Apply one coat epoxy primer to entire floor. - Patch any and all holes and cracks in floor using epoxy Cab O Sil mixture. - Apply one coat 100% solids self-leveling epoxy to floor. (Gray) - Broadcast colored vinyl fleck into 100% solids epoxy. - Clean up thoroughly upon completion.

Bid Results

Playgrounds / Parks / Athletic Fields

$29,800.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
102
Bidding Soon
2,131
All Active Projects
911
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

May 8, 2023

img_map_placeholder

305 Lakeshore Dr, Crystal Lake, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.