BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 8, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a civil project in Winnipeg, Manitoba. Completed plans call for site work for a water / sewer project.

The Work to be done under the Contract shall consist of modifications to existing infrastructure and installation of new infrastructure at the WTP to improve flood protection at the WTP. The major components of the Work are as follows: (a) DBPS Storm Pit Weeping Tile valves and automation - Supply and installation of actuated butterfly valves in the DBPS storm sump pit including electrical, control, and associated piping modifications. (b) DBPS High Level Alarm -Supply and installation of station high level flood alarm, including electrical, and controls, and interface with existing alarm. (c) Modifications to plant LDS outfall and plant overflow (MH-1) including installation of new 1500 mm sluice gate, cast-in-place extension of structure to grade, new removable roof hatches, and new ladder. (d) Replacement of plant LDS outfall and plant overflow (MH-2) riser with 1200 mm diameter riser. (e) Clearwell weeping tile outlet modifications including: (i) Abandonment of existing catch basin and culvert (ii) Supply and installation of 375 mm LDS piping (iii) Supply and installation of 100 mm force main piping (iv) Supply and installation of check valve (v) Supply and installation of new ditch inlet CB and lead (vi) Regrading of existing ditch (vii) Reseeding of existing ditch (f) Supply and installation of WTP underdrain sump pumps, electrical, controls, and high water alarms. (g) Site grading and gravel surfacing of Civil Maintenance Building parking area. The funds available for this Contract are $1,000,000.00. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Water / Sewer

$1,502,869.00

Public - City

Site Work

17

12

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2022

November 4, 2022

Project location map

To Be Determined, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.