Site work and new construction of an educational facility in Corcoran, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

New Modular TK Classrooms, Staff Restrooms and Shade Structures at Bret Harte Elementary School Anticipated Award Date: September 27, 2022. This date is for preliminary scheduling only; Owner does not guarantee this date. Anticipated Notice to Proceed Date: October 17, 2022. This date is for preliminary scheduling only; Owner does not guarantee this date Time for Completion: Complete all Work within 240 calendar days (Phase 1= 180 days, Phase 2=60days), commencing with the date established in the written notice from Owner to proceed, and ending with the date of Notice of Completion. The schedule is intended as a maximum time frame and should the Contractor be able to expedite the Work, the Owner and Architect will assist in advancing within the terms of the Contract. The project will be in progress while students and staff are on site. This Phasing Plan is intended to separate the work on the east side of the site (front of the school/ loading zone) from the work at the Modular Buildings. The Owner wants the work on the front of the school to be performed during the summer break when no students are on-site. .1 Phase 1: All work required for the installation of the Modular Buildings including all utility connections and related site work. This work is to be performed between October 17, 2022 - April 15, 2023 (180 calendar days). .2 Phase 2: All work required on the east side/ front of the school for the installation of the Shade Structures, concrete paving, synthetic turf and related site work. This work is to be performed between June 5, 2023 - August 3, 2023 (60 calendar days).

Award

Educational

$1,906,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
26
Bidding Soon
399
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

October 17, 2022

img_map_placeholder

1300 Letts Ave, Corcoran, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.