BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Cabazon, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work generally consists of installing approximately 58 new isolation valves, including excavation, pipeline restraint (as required by addition of isolation valves), backfill and compaction, trench shoring, traffic control, pavement replacement, and valve testing Questions asked by Bidders at the pre-bid conference not specifically addressed within the Contract shall be answered in writing, and shall be sent to all Bidders present at the pre-bid conference. All questions must be submitted in writing by 5:00 p.m. on Thursday, October 6, 2022 to Sinisa Saric at Krieger & Stewart, Incorporated, ssaric@kriegerandstewart.com, with a copy to Lorna Ewing at lewing@kriegerandstewart.com. NO QUESTIONS WILL BE ADDRESSED AFTER THIS TIME. Prospective bidders shall be licensed Contractors in the State of California having at least 5 years' experience and being qualified to perform the Work specified in the Contract Documents. Pursuant to Public Contract Code section 3300, bidders (Contractors) shall possess active and current Contractor's License, Class A or C-34, which shall be maintained at the time of bid and through the course of the Work. Prospective bidders must be included on the official planholder's list for the project to receive addenda and be eligible to bid this project. To be added to the planholder's list, request Contract Documents (plans and specifications) from Krieger & Stewart, Incorporated by email to Lorna Ewing at lewing@kriegerandstewart.com It is the responsibility of each prospective bidder to review and verify the completeness of the documents before submitting a bid, and to check for any applicable addenda or updates. Incomplete bids and bids that do not include signed copies of all issued addenda may be subject to disqualification. To the extent required by Section 20103.7 of the Public Contract Code, upon request from a contractor plan room service, Owner shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room. Owner reserves the right to reject any and all bid proposals, to waive any irregularity, or to award the Contract to other than the lowest bidder. If Owner elects to award a contract for the Work, the award will be made within 60 days from the date of the bid opening. Bids shall be valid for said 60 day period. Each bid proposal must be accompanied by cash, a certified or cashier's check, or bid bond issued by a surety admitted in and regulated by the State of California and further, if the work or project is financed in whole or in part with federal grant or loan funds, listed in the Treasury Departments most current Circular 570 (bid bond shall be submitted on the form included in the Contract Documents or on an equivalent form approved by Owner) for an amount not less than ten percent (10%) of the maximum amount bid. Said check or bond shall be made payable to CABAZON WATER DISTRICT and, when delivered with a bid proposal, shall constitute a guarantee that bidder will, if an award is made to them in accordance with the terms of said bidder's proposal: execute the Contract in the Owner's standard form, together with Labor Code certification thereon; furnish Contract Performance and Payment Bonds with a corporate surety or sureties satisfactory to the Owner, or equivalent substitution in lieu of bonds, each for not less than 100 percent of the bid price; furnish Certificates of Insurance evidencing that all insurance coverage required by the Contract has been secured. Bidder is advised that Contractor may, at his sole and expense, substitute securities equivalent to any monies withheld by the Owner to insure performance under the Contract. Such securities shall be deposited with the Owner or with a State or Federally Chartered Bank as escrow agent who shall pay such monies to the Contractor upon satisfactory completion of the Contract. The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. Securities eligible for substitution shall include those listed in Public Contract Code section 22300. Alternatively, the Contractor may request to have earned retentions paid directly to the escrow agent in accordance with Public Contract Code section 22300.

Award

Water / Sewer

$1,034,000.00

Public - City

Paving, Site Work

19

10

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
68
Bidding Soon
1,213
All Active Projects
573
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

November 14, 2022

img_map_placeholder

Multiple Locations, Cabazon, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.