Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a clubhouse / community center in East Fayetteville, North Carolina. Completed plans call for the construction of a clubhouse / community center; and for site work for a clubhouse / community center.
**Parent Project Report** *As of October 28, 2024, the Sitework/Demo package for this project has already been contracted, and is expected to start work in the coming weeks. GMP #2 Packages A&B have both closed for prequalifications and is currently out for bid to the previously Prequalified contractors. And also at this time, Prequalifications for GMP #3 arebeing accepted. Location: The Crown Event Center will be located in downtown Fayetteville on the block bound by E Russell Street to the south, Franklin Street to the north, Dick Street to the east, and Gillespie Street to the west. E Russell Street has an active rail line. The types of spaces which may be programmed into the building may include but are not limited to: o 2,500 to 3,000 seating capacity for events o 250 to 500 seating capacity for banquets o VIP Boxes o Membership seating o Grand lobby entrance o Meeting rooms / classrooms o Ability for food service for banquets and concessions o Concessions points of service o Dressing rooms o Loading dock with multiple truck bays for operations and show loading o "Back of house" components typical to multi-purpose centers o MEP, Equipment and Custodial spaces typical to multi-purpose centers o ADA Accessibility and access similar to a multi-purpose center o Flexible house performance o Audio, video, and lighting systems o Variety of acoustical finishes and acoustical wall construction for room performance and sound isolation o Multiple seating types - fixed, retractable, and portable o Thematic interior design and branding reflecting the region Cumberland County, North Carolina, ("County" or "Owner") through the Department of Engineering and Infrastructure, intends to contract Construction Manager at Risk (CMaR) services for the new Crown Event Center. Services will be for the Design Phase, and if the Guaranteed Maximum Price (GMP) is approved, for Construction of the project via subcontract. The project needs to be available for use no later than October 31, 2025. This will require the project to be completed and the setup, move-in, and startup of all building and tenant use functions to occur prior to October 31, 2025. Contacts: Jermaine Walker, Director, Engineering and Infrastructure Phone: 910-321-6602 E-mail: jwalker@cumberlandcountync.gov Matthew DeSilver, PE, CCM, CM-Lean MBP Carolinas Phone: 443-896-6833 E-mail: mdesilver@mbpce.com Questions must be in writing and directed to Matthew DeSilver and Jermaine Walker via email, no later than 5:00 p.m. EST January 18, 2023, per the clock located in the Issuing Office. All questions received will be answered in writing via a published Addendum to the RFQ by 5:00 p.m. EST January 23, 2023.
Award
Clubhouse / Community Centers
$82,500,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2023
January 6, 2025
To Be Determined, East Fayetteville, NC
Related To This Project
East Fayetteville, NC
Bid Date: Oct 11 2022
East Fayetteville, NC
Bid Date: Jun 07 2022
East Fayetteville, NC
Bid Date: Sep 01 2022
East Fayetteville, NC
Bid Date: Sep 29 2022
East Fayetteville, NC
Bid Date: Sep 30 2022
East Fayetteville, NC
Bid Date: Sep 27 2022
East Fayetteville, NC
Bid Date: Oct 04 2022
East Fayetteville, NC
Bid Date: Aug 25 2022
East Fayetteville, NC
Bid Date: Jan 06 2021
East Fayetteville, NC
Bid Date: Dec 08 2021
East Fayetteville, NC
Bid Date: Mar 24 2022
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Jan 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.