BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a transportation facility in Cleveland, Ohio. Completed plans call for site work for a transportation facility.

As of October 21st, 2022, project was extended until October 28th. Addition of 515 Turnout at West End of Brookpark Yard Contractor shall provide a complete signalized turnout at the west end of Brookpark Yard. A partial list of the work includes: design of the new and revised signal system, provision of new switch machines & layouts, snowmelter & control case, snow melter elements, signals, (W568) equipment case, pushbuttons, long wire loops, track circuits, cabling, bonding, installation, testing & commissioning of the complete system and other Work indicated in the Contract Documents. The provisions of 49 CFR Part 26, and 41 CFR Part 60-1, as applicable to Federal grants regarding equal employment practices and Disadvantaged Business Enterprise participation are applied to these procurements. The Engineer's Estimate is $1,270,000.00 The work to be performed under this contract consists of the demolition work, construction and completion of the entire project: Addition of 515 Turnout at West End of Brookpark Yard Project No.12F. The work is defined in this project manual, and the drawings and other documents identified herein. B. The project is located on a parcel of land at the intersection of, the northbound off ramp from highway 237 and Brookpark Road, in the City of Brookpark, in the County of Cuyahoga, in the State of Ohio. The Scope of Work shall include but is not limited to: 1. Contractor shall provide a complete signalized turnout at the west end of Brookpark Yard. A partial list of the work includes: design of the new and revised, signal system, provision of new switch machines & layouts, snowmelter & control case, snow melter elements, signals, (W568) equipment case, pushbuttons, long wire loops, track circuits, cabling, bonding, installation, testing & commissioning of the complete system and other Work indicated in the Contract Documents. 2. Track work and earth work as shown in the drawings.

Post-Bid

Transportation Terminals

$1,270,000.00

Public - City

Site Work

88

22

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
102
Bidding Soon
1,121
All Active Projects
446
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2022

December 27, 2022

img_map_placeholder

OH-237 & Brookpark Rd, Cleveland, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.