Renovation of a military facility in Anchorage, Alaska. Completed plans call for the renovation of a military facility.
Project Title: Replace Overhead Doors 673 CES is requesting the removal of four existing exterior manual overhead doors and associated rails and four manual exterior metal cage doors at buildings 55294 and 5528 IAW the Statement of Work. The subject projects Magnitude of Construction in accordance with FAR 36.204 is between $100,000 and $250,000. A sight visit will be held on 19 September 2022 @ 1400 in building 55294 673 CES is requesting the removal of four existing exterior manual overhead doors and associated rails and four manual exterior metal cage doors at buildings 55294 and 5528 IAW the Statement of Work. The subject projects Magnitude of Construction in accordance with FAR 36.204 is between $100,000 and $250,000. A sight visit will be held on 19 September 2022 @ 1400 in building 55294 Contract Description 1.1. The contract description is fully explained in the Statement of Work, Performance Work Statement or Statement of Objectives and all associated drawings and other attachments. The following are the general specifications and contract provisions that supplement and further outline the contractual and administrative actions required. If there are any questions regarding the information contained herein they should be addressed at the site visit or during the questions and answers period identified in the solicitation. 2. Contract Requirements 2.1.1 Drawings. When required, design drawings submitted by the Contractor shall show the basic layout and planning of work. Shop drawings shall show in detail the proposed fabrication and assembly of structural elements and/or the installation (i.e. form fit, and attachment details) of materials or equipment. Drawings must have sufficient detail to enable both the Contractor and the Government to understand the work to be accomplished. For the purpose of this requirement, the term drawings includes actual construction drawings, shop drawings, fabrication drawings, erection drawings, diagrams, layouts, schematics, descriptive literature, illustrations, room finish schedules, lighting/panel schedules, lighting level analysis plans, load/distribution schedules/calculations, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions as may be required. 2.1.2 Schedule of Material Submittals. The Contractor shall provide as a minimum, all submittalsidentified in the AF Form 66, Schedule of Material Submittals. The submittals shall include all reports, construction materials, and documentation that have a material effect on the construction effort including, but not limited to: large purchase items; long-lead items; required reports; and as-built drawings. 2.2 Meetings and Conferences 2.2.1 Pre-Construction Conference: The Contractor shall schedule a pre-construction conference prior to issuing a start work notice on any project, unless the requirement is waived by the Government. The Contractor shall reach out to the Project Manager and Contracting Specialist assigned to the project to schedule the meeting. The Project Manager will coordinate attendance of the Project Inspector, Base Environmental, the customer and any other applicable government party. The meeting shall be Contractor led and will discuss all aspects of the required work for a purchase order. At a minimum there should be a review of all material submittals, drawings, SOW review, schedule review, safety and accident protection, coordination's required, HAZMAT and Universal Waste storage/disposal, administrative issues, traffic control, as-built criteria, performance requirements, security procedures, and any questions the Contractor may have. Plan on these meetings taking about 60 minutes. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$250,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2022
October 26, 2022
To Be Determined, Anchorage, AK
Related To This Project
Anchorage, AK
Bid Date: Jan 12 2023
Anchorage, AK
Bid Date: Jun 14 2021
Anchorage, AK
Bid Date: Feb 07 2023
Anchorage, AK
Bid Date: Sep 07 2022
Anchorage, AK
--
Anchorage, AK
Bid Date: Sep 30 2022
Anchorage, AK
Bid Date: Jul 27 2022
Anchorage, AK
Bid Date: Aug 19 2022
Anchorage, AK
Bid Date: Sep 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.