BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 12, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a sidewalk / parking lot in Sweetwater, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

A. The contractors work shall perform the following Work Items (minimum). 1. Layout work 2. Remove existing sidewalk and front of porch 3. Replace sidewalk and front of porch as noted on the drawings 4. Install new 1:12 max slope as noted on the drawings 5. Ramp to meet new porch, where applicable slope down to drain away from porch 6. Replace expansion material at all expansion joints Bid results will be announced at the tele- conference and via email.

Bid Results

Sidewalks / Parking Lot

$38,088.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
11
Bidding Soon
221
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

November 11, 2022

Project location map

1217 Coral Dr, Sweetwater, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.