BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work and addition to an educational facility in Tacoma, Washington. Working plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

During the project, the Design / Builder will receive overall direc-tion from designated representa-tives in the Tacoma Public Schools (TPS) Planning & Construction Office and will work collabora-tively as a member of a team to achieve project objectives. In addition to staff from the TPS Planning and Construction Office, this team may include repre-sentatives from other District departments, the Design/Build Consultant (Parametrix) and other TPS consultants. The existing Oakland High School staff, students and all school functions will be relocat-ed to an alternative swing school site so that the D/B contractor can have complete control of the OMS site during construction. Oakland High School (OHS) is located in central Tacoma on two parcels of land totaling 1.95-acres. The orig-inal, main buililing, constructed in 1912 is a two-story with a daylight basement, totaling approximately 20,350sf. In 1957 a single-story with daylight basement addition, totaling approximately 21,400sf was added to the north side of the original building. The 1912 por-tion of ()HS, originally Oakland Elementary School, is recognized by the City of Tacoma Landmarks Preservation Commission as a historically significant structure. The modernized OHS will be designed to house approximately 350 students. The design and con-struction budget for this project is approximately $28,767,000. This project is funded under a capital bond that was passed. by voters in February of 2020. The preliminary, combined design and construction budget (Owner's MACC) for the project is approximately $28,767,000, with a total project budget of approximately $40,000,000. Question Deadline 01/31/2023 at 2:00 PM PT Last day for RFQ/RFP questions and comments to be submitted by Proposers for response by addendum

Final Planning

Educational

$40,000,000.00

Public - City

Addition, Demolition, Site Work

3

4

2

5

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
107
Bidding Soon
1,515
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.