Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to a detention facility in McKinney, Texas. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; and for site work for a detention facility.
**As of January 06, 2023, this project has not yet been awarded. Project most likely be awarded in the next 30-60 days.** Collin County Adult Detention Facility Phase 2 Addition Addendum #1-#5 have been issued as of 11-15-2022. Group A - Replacement of existing 500-ton chillers with new 1,000-ton chillers including modifications to existing piping and mechanical and electrical modifications for chillers, pumps, and Colling towers as needed to increase the central plant capacity to 1,000 tons. Includes integration of new equipment into the existing BMS system and sequence of operations. Group B - New 2,000 ton modular central plant located at the North parking lot of the existing Courthouse that can be expanded up to 5,000 tons. This plant shall provide chilled water for the Courthouse and Administration Building and will be decoupled from the existing central plant through motorized valves. These valves, controlled through the County's BMS system, will allow the plant to have the ability to provide supplemental cooling to other buildings on the chilled water loop. SCOPE OF WORK INCLUDES all materials, labor, equipment and services to produce or be incorporated in such construction. Question Deadline 11/07/2022 at 5:00 PM CT Questions will be submitted electronically.
Bid Results
Jails / Prisons
$61,620.00
Public - County
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2022
January 16, 2023
4300 Community Ave, McKinney, TX
Related To This Project
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
Bid Date: Jan 25 2022
McKinney, TX
Bid Date: Aug 25 2022
McKinney, TX
Bid Date: Oct 25 2022
McKinney, TX
Bid Date: Aug 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.