BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Webster City, Iowa. Completed plans call for site work for a sidewalk / parking lot.

The Boone River. Trail Concrete Panel Replacement project is found at three locations on a9.7 mile concrete trail located in Webster City that sits along the Boone River. - The trail begins at Des Moines Street and connects to Briggs Woods Park with a small gap on Ohio Street along-the City's Wastewater Treatment Plant. The project includes removal of existing concrete, surface adjustment to meet grade, 3" compactable material for pit run, 4" PCC concrete for trail tying into existing panels and surface restoration including seeding at three (3) locations: Location 1: 151 Lineal Feet ) Location 2: 39.58 Lineal Feet Location 3:12 Lineal Feet The bid security must be in the minimum amount of 5 percent (5%) of the total bid - amount including. Bid security shall be in the form of a cashier's check or a certified check, drawn on an FDIC insured bank in lowa or drawn on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn ona credit union in lowa or chartered under the laws of the United States; or a bid bond executed by a corporation authorized to contract as a surety in lowa or satisfactory to | the Jurisdiction. The bid bond must be submitted on the enclosed Bid Bond form as no other bid bond forms are acceptable. All signatures on the Bid Bond must be original signatures in ink; facsimile (fax) of any signature or use of an electronic signature on the Bid Bond is not acceptable. Bid security other than said Bid Bond shall be made payable to City of Webster City, lowa. "Miscellaneous Bank Checks," and personal, checks, as well as "Money Orders" and "Traveler's Checks" issued by persons, firms, or corporations licensed under Chapter 533C of the lowa Code, are not acceptable bid security. Performance, Payment and Maintenance Bond ) Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Webster City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Webster City from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the, improvement caused by failures in materials and construction for a period of two (2) years from and after acceptance of the Contract. Davis-Bacon wage rates apply to this Contract and all sub-contracts. The wage rate determination is included in these Specifications. Completion of Work The Notice to Proceed is anticipated to be issued after satisfactory review of executed bonds, insurance and contract. Each work area shall be diligently worked to | - completion. Work may be suspended during periods of inactivity between locations. The project is anticipated to be completed by November 31, 2022. The Contractor shall fully complete the project prior to the completion date. Full completion includes having all pavement and surface restoration and ALL work areas a open to use by the public. Work areas, once commenced shall be diligently worked to completion. Working days may be suspended by the Resident Engineer when work has been completed at any work location such that the area is open to pedestrian traffic. Should the Contractor fail to fully complete the work within the time allotted, liquidated damages of $250. per working day shall be applied for each calendar day until the work is fully complete. The City of Webster City does hereby reserve the right to reject any or ail bids, waive | informalities and to enter into such contract, or contracts, as it deems to be in the best interest of the City.

Bid Results

Sidewalks / Parking Lot

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
51
Bidding Soon
908
All Active Projects
298
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 15, 2022

December 15, 2022

May 31, 2023

img_map_placeholder

Boone River Recreational Trail, Webster City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.