BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2022 at 8:00 PM

Updated February 13, 2024

Site work for a water / sewer project in Fremont, California. Completed plans call for site work for a water / sewer project.

Five Palms Sanitary Sewer Line Replacement Project Location and Description. The Project is located at 40200 Paseo Padre Parkway, and is described as follows: the abandonment of approximately 700 LF of existing vitrified clay pipe (VCP) sanitary sewer (SS) line, and replaced in situ (or rerouted in some locations) with PVC pipe. The planned timeframe for commencement and completion of construction of the Project is: Twenty-one (21) calendar days. License. This Project requires a valid California contractor's license for the following classification(s): Class A, or Class C-36. Contractors bidding as a joint venture must secure a joint venture license prior to award of the Contract for the Project. DIR Registration. City may not accept a Bid Proposal from, or enter into the Contract with, a bidder without proof that the bidder is registered with the California Department of Industrial Relations ("DIR") to perform public work under Labor Code Section 1725.5, subject to limited legal exceptions. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that, upon award of the bid, the successful bidder will execute the Contract and submit the payment and performance bonds, the insurance certificates, and the other documentation required by the Contract Documents, within ten days after City's issuance of the Notice of Award. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price.

Award

Water / Sewer

$79,291.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
406
Active Projects
167
Bidding Soon
3,124
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2022

November 4, 2022

Project location map

40000 Paseo Padre Pkwy, Fremont, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.