Paving and renovation of a mixed-use development in Monrovia, California. Completed plans call for the renovation of a water / sewer project; and for paving for a sidewalk / parking lot.

The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. All Bids must be made on the form furnished by the City. Each Bid must be submitted in a sealed envelope addressed to the City Clerk with the Project name and identification number typed or clearly printed on the lower left corner of the envelope. Bids must remain valid and shall not be subject to withdrawal for sixty (60) Days after the Bid opening date. The 2021 edition of "Standard Specifications for Public Works Construction" ("Standard Specifications"), as amended by the Contract Documents, is incorporated into the Contract Documents by reference. Existing Structures and Electrical Services, Electrical Switch Boards, Electrical Cable and Conduit, Existing Motors, Valves, and other Motor Controls to be refed, Saw cut and demolition of AC/asphalt parking lot and Concrete Paving/Foundations. Submittals and Shop Drawings, Excavation & Trenching, Furnish and Install Concrete Foundations Pads for Electrical Equipment including Electrical trough with Diamond plating covering, SES Units, Motor Controls, Generator Switch Board, and Solar Disconnect Switch, New Electrical Service including; Transformer Pad, Trenching, Conduits, Backfill, Compaction, Pavement Repair/Asphalt AC Paving, Cable Pulling and Termination, Contractor to Furnish and Install Emergency Generator & Transfer Switch, Final Start up and closeout documentation including; start up, support, O&M Manuals, and as-built redline markups, Mobilization, Demobilization, Bond, and Insurance, Erosion and Sediment Controls, Construction BMP's. The interested bidder must provide the name of the company, the company address, the contractor's license number, and name of contact person and email address of contact person. The bidder will then be invited and given access to the bid documents. Bid documents maybe viewed and downloaded to the bidder's email site. Pursuant to Labor Code Section 6707, if this Project involves construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet or deeper, each bid submitted in response hereto shall contain, as a bid item, adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which shall conform to applicable safety orders. In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)]. In accordance with Labor Code Section 1770 et seq., the Project is a "public work". The selected Bidder (Contractor) and any Subcontractors shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations ("DIR") regarding the prevailing rate of per diem wages. Copies of those rates are on file with the Director of Public Works and are available to any interested party upon request. The Contractor shall post a copy of the DIR's determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR. Each Bid must be accompanied by a cash deposit, cashier's check, certified check, or Bidder's Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid submitted. Personal or company checks are not acceptable. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverage, within fifteen (15) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law. Each Bidder shall possess a valid Class "A", "B" and/or "C-10" Contractor's license issued by the California State Contractors License Board at the time of the Bid submission. The successful Contractor will be required to obtain a current City business license. City of Monrovia Well Field Electrical Improvement Project Project No. G-947 Five percent (5%) of any progress payment will be withheld as retention. In accordance with Public Contract Code Section 22300, and at the request and expense of the Contractor, securities equivalent to the amount withheld may be deposited with the City or with a State or federally chartered bank as escrow agent, which shall then pay such moneys to the Contractor. Upon satisfactory completion of the Project, the securities shall be returned to the Contractor. Alternatively, the Contractor may request that the City make payments of earned retentions directly to an escrow agent at the Contractor's expense. No such substitutions shall be accepted until all related documents are approved by the City Attorney. Liquidated damages shall accrue in the amount of $2,500.00 for each Day that Work remains incomplete beyond the Project completion deadline specified in the Contract Documents. The City reserves the right to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in its best interest.

Award

Water / Sewer

$2,977,940.00

Public - City

Paving, Renovation

28

14

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Structural Aluminum Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
138
Bidding Soon
2,384
All Active Projects
963
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2022

December 19, 2022

img_map_placeholder

2655 S Myrtle Ave, Monrovia, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Well Field Electrical Improvement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.